Chapter 7 Frame Relay Setup
36
7.3
Step by Step Setup Instructions
Connect a cable between the COM port of your PC and the Console port of the IP 6610. Then follow the
instructions below.
Double-click the LoopTerm icon on your PC’s desktop screen. The following screen will appear. Then
double–click on the icon in the figure below (see arrow).
A screen with a flashing cursor will appear. You must establish the WAN1 layer 2 protocol. Key in the
command
set wan1 protocol frame_relay
followed by the required parameters and their values. The
parameter/value list we entered was:
q933 n391 10 n392 4 n393 5 t391 20
. Please note that these
parameters must match the parameters on the network side. Press the Enter key.
You must establish the WAN1 PVC parameters. Key in the command
set wan1 pvc dlci
followed by your
required parameter and its values. Then press the Enter key.
The parameters and values we used are shown in the table below.
Pvc#
1-10
DLCI
0/16-991
[CIR]
[Bc]
[Be]
[burst]
1
17
512
512
64
128
Note:
In the above screen
512
is the value for the CIR (Committed Information Rate) of PVC#1.
The total sum of the CIR values for all PVCs (ie. 1-10) must not exceed the total physical
Содержание IP6610
Страница 2: ...2011 Loop Telecommunication International Inc All rights reserved Version 33 23 MAR 2011...
Страница 76: ...Chapter 11 Port Forwarding Virtual Service 53...
Страница 79: ...Chapter 12 QoS 56 Figure 12 1 QoS Application...
Страница 119: ...Chapter 20 Setting Up Firmware Configuration Up Download with TFTP Server 96...