25
11.0
FLUE TERMINAL INSTALLATION
11.1
TYPE C
13
(HORIZONTAL ROOM SEALED)
11.1.1
HORIZONTAL
CONCENTRIC
ROOM
SEALED
APPLICATION,
MODELS
HCB46CE-HCB61CE
11.1.2
HORIZONTAL
CONCENTRIC
ROOM
SEALED
APPLICATION,
MODELS
HCB86CE
When the boiler is installed as a Type C
13
(Horizontal concentric) appliance, the flue system should be installed as
follows:
1.
Determine the location of the flue terminal, taking into account minimum distances as detailed in Section
10.4.1 and the relevant British Standards.
2.
Taking care to protect the appliance from debris and dust, drill a hole in the desired location. The diameter
of the hole should be no more than 10mm greater than the diameter of the air supply pipe of the terminal.
3.
Determine the required length of the terminal and cut as necessary.
When determining the required length for the flue terminal, the outer wall plate or rosette
should be flush to the wall. (see 11.1.3 )
Once cut; remove all burrs and sharp edges
4.
Insert the terminal into the drilled hole. The terminal section should be installed level or with a fall to outside
(Max. 10mm per metre) to prevent the ingress of water.
When inserting the terminal, ensure the air intake section is at the bottom.
Содержание HERALD HCB116CE
Страница 8: ...8 3 1 2 PRINCIPLE PARTS TO BE USED IN CONJUNCTION WITH TABLE 3 1 1...
Страница 11: ...11 5 2 CLEARANCES 5 2 1 ENCLOSURE INSTALLATION CLEARANCES MM 5 2 2 PLANT ROOM INSTALLATION CLEARANCES MM...
Страница 31: ...31 Max distance between brackets...
Страница 32: ...32...
Страница 33: ...33...
Страница 37: ...37...
Страница 53: ...53 15 8 WIRING DIAGRAM 15 8 1 WIRING DIAGRAM...
Страница 54: ...54 15 9 LADDER DIAGRAM 15 9 1 LADDER DIAGRAM...
Страница 92: ...92...