
21
To install the flue connection to the HCB46CE – HCB61CE boilers the following procedure should be followed:
1.
Check you have all items shown in Section 10.2.1
2.
Check the flue temperature sensor (supplied with the boiler) is securely located into the hole on the exhaust
transition.
If the flue temperature sensor is not fitted, the flue gas may exceed the maximum temperature
rating of the flue and can lead to severe personal injury, death or substantial property damage.
3.
Insert the air intake transition (Item 4) into the intake connection reducer (shown below) and tighten the worm
drive clip.
4.
To the bottom (exhaust) connection of the concentric adaptor fit one of the 80mm 90 elbows, and then fit the
80mm x500mm flue pipe cut to length as in Section 10.2.2.
5.
To the side (intake) connection of the concentric adaptor, fit the remaining 90
elbows.
6.
Fit the Concentric adapter (item 3) to the exhaust flue pipe and air inlet elbows
7.
Fit the flue gas test point (Item 2) and clamp using its locking band.
The completed transition kit should look like the photos shown below.
REAR VIEW TRANSITION KIT HCB46CE-HCB61CE
SIDE VIEW TRANSITION KIT HCB46CE-HCB61CE
10.2.3
TRANSITION
KIT
FITTED
TO
APPLIANCE
Содержание HERALD HCB116CE
Страница 8: ...8 3 1 2 PRINCIPLE PARTS TO BE USED IN CONJUNCTION WITH TABLE 3 1 1...
Страница 11: ...11 5 2 CLEARANCES 5 2 1 ENCLOSURE INSTALLATION CLEARANCES MM 5 2 2 PLANT ROOM INSTALLATION CLEARANCES MM...
Страница 31: ...31 Max distance between brackets...
Страница 32: ...32...
Страница 33: ...33...
Страница 37: ...37...
Страница 53: ...53 15 8 WIRING DIAGRAM 15 8 1 WIRING DIAGRAM...
Страница 54: ...54 15 9 LADDER DIAGRAM 15 9 1 LADDER DIAGRAM...
Страница 92: ...92...