
2
Prepare boiler
(continued)
15
Figure 2-3 Gas Valve Adjustment - Models 600 - 850
Models 600 - 850
1. Lift the top bezel (prop the bezel up for service).
2. Remove the cover on top of the gas valve (FIG. 2-3).
3. Use a combustion analyzer to verify CO
2
is within the range
of 9.0 – 11.0%. If not, adjust the screw
counterclockwise
incrementally to raise CO
2
and
clockwise
to lower CO
2
(FIG. 2-3).
4. After adjustment is complete, attach the propane
conversion label (in the conversion kit bag) next to the
boiler rating plate. Attach the LP caution label (in the
conversion kit bag) to the rear of the boiler underneath
the gas supply piping.
5. Replace the gas valve cover and lower the bezel.
WARNING
Failure to check and verify combustion
could result in severe personal injury,
death, or substantial property damage.
Installation & Operation Manual
Figure 2-2A 400 Model_Venturi with LP Orifi ce
Figure 2-2B 500 Model_Venturi with LP Orifi ce
Содержание 500
Страница 55: ...55 8 Field wiring continued Figure 8 3 Low Voltage Field Wiring Connections Installation Operation Manual ...
Страница 60: ...60 Figure 10 2 Operating Instructions 10 Start up Installation Operation Manual ...
Страница 78: ...78 Figure 13 1 Wiring Diagram 13 Diagrams Installation Operation Manual ...
Страница 79: ...Figure 13 2 Ladder Diagram 13 Diagrams continued 79 Installation Operation Manual ...