20
3
General
venting
Installing vent and air piping
Use only cleaners, primers, and solvents
that are approved for the materials which
are joined together.
NOTICE
PVC/CPVC
All PVC vent pipes must be glued, properly
supported, and the exhaust must be
pitched a minimum of a 1/4 inch per foot
back to the boiler (to allow drainage of
condensate).
NOTICE
WARNING
The vent connection to the appliance must
be made with the starter CPVC pipe section
provided with the appliance if PVC/CPVC
vent is to be used. The fi eld provided
vent fi ttings must be cemented to the
CPVC pipe section using an “All Purpose
Cement” suitable for PVC and CPVC pipe.
Use only the vent materials, primer, and
cement specifi ed in Table 3E to make
the vent connections. Failure to follow
this warning could result in fi re, personal
injury, or death.
WARNING
Insulation should not be used on PVC
or CPVC venting materials. The use of
insulation will cause increased vent wall
temperatures, which could result in vent
pipe failure.
This product has been approved for use with the PVC/CPVC
vent materials listed in Table 3E on page 21.
Installation & Operation Manual
Common venting
FTXL boilers may be common vented; however, the following
criteria MUST BE followed:
1. Only FTXL boilers may be connected to the common
vent. DO NOT mix other manufacturer’s appliances or
other Lochinvar models.
2. FTXL boilers connected to the common vent must all be
of the same size.
3. Each FTXL boiler must have a Lochinvar supplied fl ue
damper installed (see Table 3D).
4. Only vertical direct vent, positive pressure, Category
IV or vertical/chimney vent, negative pressure, Category
II may be used when common venting FTXL boilers.
Sidewall common venting is not allowed.
5. FTXL boilers in a common vent must be connected and
controlled with the integral FTXL SMART SYSTEM
Cascade.
a. The Leader may be controlled through the FTXL
SMART SYSTEM control through BMS (external
0 - 10V signal), ModBus, BACnet, or its own internally
calculated
set
point.
b. The Cascade (Members) must be controlled by the
FTXL Leader boiler using the Lead/Lag Cascade
option.
For approved common vent sizing, contact the factory.
WARNING
When FTXL boilers are common vented,
the criteria above MUST BE followed.
Failure to follow all these requirements
will result in severe personal injury, death,
or substantial property damage.
NOTICE
When FTXL boilers are common vented,
hot water generators must be piped to the
primary heating loop and tank thermostats
must not be connected to the FTXL.
Table 3D Flue Damper Kits
Flue Damper Kits
Model
Damper Size
Kit Number
400
4"
DRH30006
500
4”
DRH30006
600
4”
DRH30006
725
6”
DRH30007
850
6”
DRH30007
Содержание 500
Страница 55: ...55 8 Field wiring continued Figure 8 3 Low Voltage Field Wiring Connections Installation Operation Manual ...
Страница 60: ...60 Figure 10 2 Operating Instructions 10 Start up Installation Operation Manual ...
Страница 78: ...78 Figure 13 1 Wiring Diagram 13 Diagrams Installation Operation Manual ...
Страница 79: ...Figure 13 2 Ladder Diagram 13 Diagrams continued 79 Installation Operation Manual ...