8-4
CHAPTER 8: TROUBLESHOOTING GUIDE
ECOLOAD S2
1.3. Error message description and troubleshooting guide
An error code means signals combination from sensors which match error code definition in the PLC
program. Follow the troubleshooting procedures below to solve the problems and reset the bar feeder
from the error by pressing the MANUAL mode key.
e01 Emergency stop circuit is open
Description
Emergency stop circuit which goes through contacts below is
open :
emergency stop button on HMI.
emergency stop button on remote control.
emergency stop contacts on the lathe
air
pressure
switch
retraction system safety sensor
Troubleshooting
1.
Check if emergency stop button on HMI is pressed. If so,
please reset it.
2.
Check if emergency stop button on remote control is
pressed. If so, please reset it.
3.
Check if emergency stop contacts on the lathe were wired
to bar feeder emergency stop loop and is open. If so,
please reset it.
4.
Check if the air pressure is not enough. The air pressure
switch will trip if the air pressure is lower than 4 kg/cm
2
.
5.
Check if the retraction system safety sensor is connected
and open.
e02 FIRST FEED setup is too big
Description
The short pusher exceeds the position of <P08+20mm>.
Troubleshooting
Check if 1st feed limit (P08) setup is too small.
e03 BAR END setup is too small
Description
When bar feeder is switched into automatic mode, the pusher’s
current position is larger than the BAR END position
Troubleshooting
Check if Bar End setup is too small.
Содержание Eco Load S2
Страница 1: ...LNS SA 2534 Orvin Switzerland www LNS group com Instruction manual ENG 9 ECO 01 ...
Страница 2: ......
Страница 5: ...CHAPTER 1 BASIC NOTIONS 1 1 ECOLOAD S2 CHAPTER 1 BASIC NOTIONS ...
Страница 12: ...1 8 CHAPTER 1 BASIC NOTIONS ECOLOAD S2 ...
Страница 13: ...CHAPTER 2 TECHNICAL DATA 2 1 ECOLOAD S2 CHAPTER 2 TECHNICAL DATA ...
Страница 16: ...2 4 CHAPTER 2 TECHNICAL DATA ECOLOAD S2 2 2 X axis retraction system ˆˉ ˇˊˋ ˇˊˉ ˈ ˉ ˇ ˈ ʳˀˆ ˌˁˈ ...
Страница 17: ...CHAPTER 2 TECHNICAL DATA 2 5 ECOLOAD S2 2 3 Z axis retraction system ˋˆˊ ˊˋˊ ˌˊ ˉ ˁˈ ʳ ˆˇ ˈ ...
Страница 19: ...CHAPTER 3 SETTING INTO OPERATION 3 1 ECOLOAD S2 CHAPTER 3 SETTING INTO OPERATION ...
Страница 36: ...3 18 CHAPTER 3 SETTING INTO OPERATION ECOLOAD S2 ...
Страница 37: ...CHAPTER 4 ELECTRICS 4 1 ECOLOAD S2 CHAPTER 4 ELECTRICS ...
Страница 43: ...CHAPTER 4 ELECTRICS 4 7 ECOLOAD S2 4 2 Circuit diagram ...
Страница 45: ...CHAPTER 4 ELECTRICS 4 9 ECOLOAD S2 5 2 PLC I O DIAGRAMS ...
Страница 54: ...4 18 CHAPTER 4 ELECTRICS ECOLOAD S2 ...
Страница 55: ...CHAPTER 5 PNEUMATICS 5 1 ECOLOAD S2 CHAPTER 5 PNEUMATICS ...
Страница 57: ...CHAPTER 5 PNEUMATICS 5 3 ECOLOAD S2 2 PNEUMATIC CIRCUIT DIAGRAM ...
Страница 62: ...5 8 CHAPTER 5 PNEUMATICS ECOLOAD S2 ...
Страница 63: ...CHAPTER 6 GENERAL DESCRIPTION 6 1 ECOLOAD S2 CHAPTER 6 GENERAL DESCRIPTION ...
Страница 77: ...CHAPTER 7 OPERATION 7 1 ECOLOAD S2 CHAPTER 7 OPERATION ...
Страница 98: ...7 22 CHAPTER 7 OPERATION ECOLOAD S2 ...
Страница 99: ...CHAPTER 8 TROUBLESHOOTING GUIDE 8 1 ECOLOAD S2 CHAPTER 8 TROUBLESHOOTING GUIDE ...
Страница 109: ...CHAPTER 9 APPENDICES 9 1 ECOLOAD S2 CHAPTER 9 APPENDICES ...