3-4
CHAPTER 3: SETTING INTO OPERATION
ECOLOAD S2
3. MOUNTING OF THE RETRACTION SYSTEM (optional)
The magazine slides with the bar feeder when the retraction is used. Before
mounting the system, make sure the floor surface is flat and smooth.
The retraction system allows the bar feeder moving on certain distance so that there is some space
behind the spindle for service.
The retraction system is an optional and integrated device. The user can order it along with the bar
feeder or order it later upon requirement.
If it is not equipped with your bar feeder, please skip this section.
3.1. Mounting of the X-axis retraction system
The X-axis retraction system allows the bar feeder moves among the lateral direction.
This movement gives more space on the longitudinal direction.
Please follow the steps below to install the retraction system.
Lift the bar feeder according to the corresponding procedure in this
chapter.
Remove the safety sensor protector and sensor by sequence.
Screw the retraction system toward the bar feeder stand.
Notice the locking device must be placed toward the front of the bar
feeder.
Move the bar feeder backward and forward couple times and
confirm the retraction system was mounted properly.
Mount the safety sensor and sensor protector by sequence.
Insert the cable into the electrical cabinet from the opening behind
the bar feeder.
Make sure that the cable will not be clamped when the bar feeder is
moving on the retraction system.
Insert wire 18 and 110 into contact 18 and 110 on terminal TB17.
Move the jumper from contact 18 and 110 to the storage socket as shown.
Jumper storage socket
Jumper
Sensor
Sensor
protection
Содержание Eco Load S2
Страница 1: ...LNS SA 2534 Orvin Switzerland www LNS group com Instruction manual ENG 9 ECO 01 ...
Страница 2: ......
Страница 5: ...CHAPTER 1 BASIC NOTIONS 1 1 ECOLOAD S2 CHAPTER 1 BASIC NOTIONS ...
Страница 12: ...1 8 CHAPTER 1 BASIC NOTIONS ECOLOAD S2 ...
Страница 13: ...CHAPTER 2 TECHNICAL DATA 2 1 ECOLOAD S2 CHAPTER 2 TECHNICAL DATA ...
Страница 16: ...2 4 CHAPTER 2 TECHNICAL DATA ECOLOAD S2 2 2 X axis retraction system ˆˉ ˇˊˋ ˇˊˉ ˈ ˉ ˇ ˈ ʳˀˆ ˌˁˈ ...
Страница 17: ...CHAPTER 2 TECHNICAL DATA 2 5 ECOLOAD S2 2 3 Z axis retraction system ˋˆˊ ˊˋˊ ˌˊ ˉ ˁˈ ʳ ˆˇ ˈ ...
Страница 19: ...CHAPTER 3 SETTING INTO OPERATION 3 1 ECOLOAD S2 CHAPTER 3 SETTING INTO OPERATION ...
Страница 36: ...3 18 CHAPTER 3 SETTING INTO OPERATION ECOLOAD S2 ...
Страница 37: ...CHAPTER 4 ELECTRICS 4 1 ECOLOAD S2 CHAPTER 4 ELECTRICS ...
Страница 43: ...CHAPTER 4 ELECTRICS 4 7 ECOLOAD S2 4 2 Circuit diagram ...
Страница 45: ...CHAPTER 4 ELECTRICS 4 9 ECOLOAD S2 5 2 PLC I O DIAGRAMS ...
Страница 54: ...4 18 CHAPTER 4 ELECTRICS ECOLOAD S2 ...
Страница 55: ...CHAPTER 5 PNEUMATICS 5 1 ECOLOAD S2 CHAPTER 5 PNEUMATICS ...
Страница 57: ...CHAPTER 5 PNEUMATICS 5 3 ECOLOAD S2 2 PNEUMATIC CIRCUIT DIAGRAM ...
Страница 62: ...5 8 CHAPTER 5 PNEUMATICS ECOLOAD S2 ...
Страница 63: ...CHAPTER 6 GENERAL DESCRIPTION 6 1 ECOLOAD S2 CHAPTER 6 GENERAL DESCRIPTION ...
Страница 77: ...CHAPTER 7 OPERATION 7 1 ECOLOAD S2 CHAPTER 7 OPERATION ...
Страница 98: ...7 22 CHAPTER 7 OPERATION ECOLOAD S2 ...
Страница 99: ...CHAPTER 8 TROUBLESHOOTING GUIDE 8 1 ECOLOAD S2 CHAPTER 8 TROUBLESHOOTING GUIDE ...
Страница 109: ...CHAPTER 9 APPENDICES 9 1 ECOLOAD S2 CHAPTER 9 APPENDICES ...