CHAPTER 7: OPERATION
7-13
ECOLOAD S2
P03 Feeding length
This parameter should be MODIFIED if
production part changed.
The distance of bar stock needed to be fed for making a
part.
Position
Current pusher position (measured from home position).
Part Length
The needed feeding part length is :
< part length > + < cut off width >
P04 Pusher retract position 1 of 2
The pusher retracting DISTANCE to avoid its tip contacting
The pusher retraction
DISTANCE
to avoid its tip contacting
with rotating spindle.
Position
Current pusher position measured from home position SR3.
Return Stroke
The
DISTANCE
that the pusher should
RETRACT
so that it’s
tip does not contact the rotating bar stock.
Due to there is no rotating adapter between the pusher and the bar stock, the pusher tip must not contact
any rotating component or it will be damaged. Below is the summary for those cases and their solutions :
Direction Situation
Solution Parameter
Axial
The pusher touches the bar
stock rear end.
Keep the pusher away from the rotating
bar stock when feeding is accomplished.
P04
Lateral
The pusher touches the rotating
spindle because it’s own weight
droop it’s tip.
Keep the pusher behind the position
where its tip starts to droop to the rotating
spindle.
P02
P05 Top cut distance
Position
The distance which the tip of a new bar travels after it
touches the TOP CUT sensor.
Top cut
The position where the tip of a new bar will be positioned in
AUTO cycle.
Return Stroke
Top cut
Содержание Eco Load S2
Страница 1: ...LNS SA 2534 Orvin Switzerland www LNS group com Instruction manual ENG 9 ECO 01 ...
Страница 2: ......
Страница 5: ...CHAPTER 1 BASIC NOTIONS 1 1 ECOLOAD S2 CHAPTER 1 BASIC NOTIONS ...
Страница 12: ...1 8 CHAPTER 1 BASIC NOTIONS ECOLOAD S2 ...
Страница 13: ...CHAPTER 2 TECHNICAL DATA 2 1 ECOLOAD S2 CHAPTER 2 TECHNICAL DATA ...
Страница 16: ...2 4 CHAPTER 2 TECHNICAL DATA ECOLOAD S2 2 2 X axis retraction system ˆˉ ˇˊˋ ˇˊˉ ˈ ˉ ˇ ˈ ʳˀˆ ˌˁˈ ...
Страница 17: ...CHAPTER 2 TECHNICAL DATA 2 5 ECOLOAD S2 2 3 Z axis retraction system ˋˆˊ ˊˋˊ ˌˊ ˉ ˁˈ ʳ ˆˇ ˈ ...
Страница 19: ...CHAPTER 3 SETTING INTO OPERATION 3 1 ECOLOAD S2 CHAPTER 3 SETTING INTO OPERATION ...
Страница 36: ...3 18 CHAPTER 3 SETTING INTO OPERATION ECOLOAD S2 ...
Страница 37: ...CHAPTER 4 ELECTRICS 4 1 ECOLOAD S2 CHAPTER 4 ELECTRICS ...
Страница 43: ...CHAPTER 4 ELECTRICS 4 7 ECOLOAD S2 4 2 Circuit diagram ...
Страница 45: ...CHAPTER 4 ELECTRICS 4 9 ECOLOAD S2 5 2 PLC I O DIAGRAMS ...
Страница 54: ...4 18 CHAPTER 4 ELECTRICS ECOLOAD S2 ...
Страница 55: ...CHAPTER 5 PNEUMATICS 5 1 ECOLOAD S2 CHAPTER 5 PNEUMATICS ...
Страница 57: ...CHAPTER 5 PNEUMATICS 5 3 ECOLOAD S2 2 PNEUMATIC CIRCUIT DIAGRAM ...
Страница 62: ...5 8 CHAPTER 5 PNEUMATICS ECOLOAD S2 ...
Страница 63: ...CHAPTER 6 GENERAL DESCRIPTION 6 1 ECOLOAD S2 CHAPTER 6 GENERAL DESCRIPTION ...
Страница 77: ...CHAPTER 7 OPERATION 7 1 ECOLOAD S2 CHAPTER 7 OPERATION ...
Страница 98: ...7 22 CHAPTER 7 OPERATION ECOLOAD S2 ...
Страница 99: ...CHAPTER 8 TROUBLESHOOTING GUIDE 8 1 ECOLOAD S2 CHAPTER 8 TROUBLESHOOTING GUIDE ...
Страница 109: ...CHAPTER 9 APPENDICES 9 1 ECOLOAD S2 CHAPTER 9 APPENDICES ...