INSTALLATION 

 

 
 

WARNING- FAILTURE  TO INSTALL  THE AMERICAS HEAT FURNACE 
ACCORDING  TO  INSTRUCTIONS  MAY VOID THE WARRANTY. 

 

 

 

Install the Americas  Heat furnace in a room with adequate air for combustion  and ventilation - 60 

cubic feet per minute  minimum.   Minimum  clearances for the Americas Heat furnace  is 32" from top of 
furnace to ceiling,  30" from  the front of the furnace to the wall, 6"on either side and 18"  from  the back  of the 
furnace to the wall. 

 

The  Americas Heat  furnace is for use as a primary heat source.   The Americas  Heat 

furnace should  be installed  with  the metal hot air plenum connected to metal hot  air duct  work  and metal 
cold air return  plenum  joined  to return  air system. 
This unit is not designed  to be installed as an ad-on furnace.  If you plan to use the Americas  Heat  furnace 

in conjunction  with another  furnace, install safety measures to prevent air back  feed from one furnace  to the 
other.  Failure to take this precaution  could cause either furnace to overheat. 

 

**IMPORTANT**   

Maintain  the 14"  x 14" (196 sq. in.) hot air and return air 

connections to your existing duct work. Reduction in size of these connections can restrict air movement 
over and thru the heat  exchanger,  resulting in overheating and operational problems  with  the furnace. 

 

Connect  the Americas  Heat furnace to a lined masonry chimney acceptable  to the authority having 

jurisdiction.  USA installation  may  also use a residential type and building heating  appliance  chimney. 
Canadian installation  may  also use  a 6" (minimum) metal flue pipe using sheet metal  screws. Do not 
connect the furnace  to any chimney  flue servicing any other heating appliance,  as recommended  by the 
Nation Fire Prevention  Association.   All chimney connections must meet the approval  of the local building 
inspector and fire marshall  and conform  to all local, state, provincial and national  codes. 

 

**IMPORTANT**   

The  following procedure  for measuring and setting the proper  chimney  draft is probably 

the most important  installation  procedure  to follow for the proper operation  of the Americas  Heat  furnace. 

 

The Americas  Heat  furnace requires .02- .04 in. water column draft (chimney  draft)  on low fire, to 

assure proper operation.   Low fire mode is when the thermostat is satisfied  and  fuel is not being augered 
into the burner. When  the chimney  draft is too high, burner fire may go out. If the chimney  draft is too low, 
smoke may back  up in the furnace  and storage bin, causing a possible hazard. 

 

The  supplied  barometric  regulator  should be installed in the flue (as per  the enclosed  instructions) 

to properly regulate  .02- .04 inc.  water column draft.  The counter weight setting on the barometric 
regulator regulates this setting. (See "ADJUSTING THE CONTROL" instructions  below.) 

 

 

 

 
 
 

Содержание America's Heat AH-100

Страница 1: ...OWNERS MANUAL Model AH 100 Furnace 100 000 Btu Model AH 170 Furnace 170 000 Btu LMF MANUFACTURING Manufacturing Facility 900 Park Avenue Woolrich PA 17779 570 769 7775...

Страница 2: ...confidence in that your Americas Heat Furnace will serve your heating needs now and for years to come We ask that you follow our policy of safety first when installing and using your Americas Heat fur...

Страница 3: ...efficient and safe operation Have a qualified service person perform tasks you are not familiar with 8 Caution Children and adults should be alerted to the potentially high surface temperatures of th...

Страница 4: ...Package includes 1 Fuel Delivery Coupler 1 Barometric Draft Control 1 Self Tapping Bolt 1 Hopper Hardware Bag 3 Wire Nut connectors 2 Wooden Handles 2 Insert burner auger assembly into burner auger t...

Страница 5: ...mp securely It is advisable to install two sheet metal screws not supplied thru the clamp auger boot and into the hopper bin outlet to insure a permanent connection Install fuel delivery coupler betwe...

Страница 6: ...nnect the Americas Heat furnace to a lined masonry chimney acceptable to the authority having jurisdiction USA installation may also use a residential type and building heating appliance chimney Canad...

Страница 7: ...I Fig 1 YllUl...

Страница 8: ...ol See Installation Adjust ment If flue pipe is made of material too heavy to bend out into collar make the diameter of the opening within lh of the inside diameter of the collar THERMOSTAT WIRING Con...

Страница 9: ...d be followed at the beginning of each heating season This procedure should also be followed if the hopper is allowed to empty and the resulting sticky smoke film coats the hopper feed auger Powdered...

Страница 10: ...red wire Blower speed can be changed by accessing the other wires behind the left side air filter Disconnect the black to black wire and reconnect to the desired colored wire using existing wire nut...

Страница 11: ...ner with a furnace poker or equivalent tool 2 Check corn or pellet level in holding bin for adequate supply Weekly 1 Check contents of ash drawer and empty as needed Ashes should be placed in a metal...

Страница 12: ...re the precise draft control A setting of 02 03 is ideal In most installations the counter weight on the automatic barometric dampers should be set on the minimum setting Adjusting the on and off cycl...

Страница 13: ...11 REPAIR PARTS Cabinet ModeiBM 620 9...

Страница 14: ...TRIM 9 6440 ASH DRAWER TRIM 1 Jo A 6040 FURNACE FLOOR 11 6220 FRONT PANEL 12 6200 COLD AIR WALL 13 6280 15_ IDE PANEL LEFT OR RIGHT HANDED FURNACEL 14 6240 RIGHT SIDE PANEL AUGER HOLE Ot _THE_RIGHT SI...

Страница 15: ...12 REPAIR PARTS Model AH 170 Cabinet 11 16 Q 18...

Страница 16: ...7 A 4180 BURNER DOOR 8 6460 DOOR TRIM 9 6440 ASHDRAWER TRIM 10 A 6040 FURNACE FLOOR 11 6220 FRONTPANEL 12 5050170 BLOWER HOUSING 13 6280170 BLANK SD I E PANEL LEFT OR RIGHT HANDEDFURNACE 14 6240 RIGHT...

Страница 17: ...r 4 3 KEY PART NUMBER PART DESCRIPTION 1 5700 BURNER HEAT SHIELD 2 5680 HEAT DEFLECTOR 3 5660 SIDE HEAT SHIELD 4 5640 TOP HEAT SHIELD 5 A 5720 HEAT EXCHANGER 6 2200 WOODEN HANDLE 7 2040 5 16 x 1 SHOUL...

Страница 18: ...REPAIR PARTS Electrical tJ 20 6 14...

Страница 19: ...NG 12 1360 JUNCTION BOX 4 X4 13 1400 JUNCTION BOXCOVER 4 X4 14 1300 EMT CONDUIT 36 LONG 15 1640 FAN UMITCONTROL 16 1840 COMPLETE BLOWER 1 7 2080 FURNACE FILTER 20 X20 X 1 18 1860 COMBUSTION BLOWER 19...

Страница 20: ...7 A 4180 BURNER DOOR 8 6460 DOOR TRIM 9 6440 ASH DRAWER TRIM 10 A 6040 FURNACE FLOOR 11 6220 FRONT PANEL 12 5050170 BLOWER HOUSING 13 6280170 BLANK SIDE PANEL LEFT OR RIGHT HANDED FURNACE 14 6240 RIG...

Страница 21: ...REPAIR PARTS Furnace Auger PART DESCRIPTION FURNACE AUGEFrMoTOR LOCK COLLAR 1 4 x 1 2 SELF TAPPING SOLT BURNER AUGER cc c c c SHEET METAL SCREW 10 x 1 3 4 r A U G _E R 8 U PPORT 6 x 6 BOX 16...

Страница 22: ...f 9 10 KEY PART NUMBER PART DESCRIPTION 1 A 3220 HOPPER AUGER 2 3180 LOCK COLLAR 3 1880 HOPPER AUGER MOTOR 4 1410 6 x 6 BOX 5 A 3070 AUGER SUPPORT 6 2070 SHEET METAL SCREW 10 1 3 4 7 7530 RUBBER TEE 8...

Страница 23: ...17...

Страница 24: ...F731 BLOWER COMPLETE 2 4C710 WHEEL 3 A40152 MOTOR MOUNTING BRACKET 4 2C355 HOUSING SUPPORTS 5 8122420 VIBRATION PADS 6 HEX HD MACH SCREW 10 24 x 7 8 7 NUT 10 24 8 HEXHD THREAD CUTTING SCREW 10 x 3 _ 9...

Страница 25: ...BLOWER AH 170 ASSEMBLED DIRECT DRIVE FURNACE BLOWER 18a...

Страница 26: ...REPAIR PARTS Storage Bin Model KEY PART NUMBER PART DESCRIPTION 1 7520 BIN LID f 1 2 7500 BIN CAVITY 1 3 7510 BIN BASE 19...

Страница 27: ...ating it with a return air system a return air plenum must be built The size of the plenum opening can be up to 21 x 21 square Before installing the plenum the air filters and filter rack may be remov...

Страница 28: ......

Страница 29: ......

Страница 30: ...rm below and return this form along with the defective part within five 5 days If defective part is not returned within the allotted time your credit card will be charged Full Name of Buyer Address Ci...

Отзывы: