
Make connections to the furnace junction box from a 120v, 15 amp fused
circuit; black to black, white to white and ground to ground terminal located
inside junction box. Solder and tape or use wire nuts on all connections.
BURNER LIGHTING
1.
Add dry, (14%-15% moisture) clean USDA #3 or better) corn or pellets to
holding bin. (See "Important" below) CAUTION: corn or pellets with
stalks, excess cob, fines, dirt, etc. may cause the augers to plug resulting
in excessive wear and possible auger motor failure. Burning treated seed
corn is not suggested because of excessive clinker build up and problems
with fire extinguishing, caused by the treatment used on the corn.
**IMPORTANT** Use of powdered graphite: On the initial lighting of the furnace,
add only approx. 2-3 cups of corn to the hopper, then add approx. 4-5
tablespoons of powdered graphite. Continue with steps 2 thru 7. As the corn
and graphite feeds into the hopper auger, repeat this procedure two more times.
The powdered graphite will lubricate the hopper auger until it begins to polish
from the flow of the corn or pellets. This procedure should be followed at the
beginning of each heating season. This procedure should also be followed if the
hopper is allowed to empty and the resulting sticky smoke film coats the hopper
feed auger. Powdered graphite may also be added once a month at a time when
the hopper is low on fuel, to help keep the auger lubricated and polished.
2.
Turn on the electric power to the furnace.
3.
Turn thermostat to highest setting.
4.
Fill burner with corn or wood pellets to the lower set of air holes located on
the inside of the burner.
5.
Liberally fill burner to the top with kindling wood and paper, light paper
and close the door. NOTE: Gelled fire starter may be used as a
substitute.
6.
Depress switch to start position. This will activate the combustion blower
only. Continue to depress switch to start position for three to five minutes
or until auger motors are activated. (Fuel will not begin to auger until
furnace has reached operating temperature and auger motors are
activated.)
7.
Turn switch to "ON" position.
8.
Set wall thermostat to temperature desired.
9.
It may be necessary to add kindling wood a couple of times before the
corn is completely ignited.
NOTE: If the burner has been used, all leftover ash and clinkers must be
thoroughly removed from the burner before lighting instructions above.
8
Содержание America's Heat AH-100
Страница 7: ...I Fig 1 YllUl...
Страница 13: ...11 REPAIR PARTS Cabinet ModeiBM 620 9...
Страница 15: ...12 REPAIR PARTS Model AH 170 Cabinet 11 16 Q 18...
Страница 18: ...REPAIR PARTS Electrical tJ 20 6 14...
Страница 23: ...17...
Страница 25: ...BLOWER AH 170 ASSEMBLED DIRECT DRIVE FURNACE BLOWER 18a...
Страница 28: ......
Страница 29: ......