SECTION I - FOREWORD

As is the case with any fine piece of equipment, care 

must be taken to provide the proper attention to the 

operation and maintenance details of this machine.

This manual of instructions has been prepared to help 

you become well-acquainted with those details, and in 

doing so, you will be able to give your Wing Heating 

Coil the care and attention any piece of equipment 

needs and deserves.

ETL Coil Operating Parameters:

Maximum elevation is 9,000 ft. (2,743.2m).

Maximum operating temperature is 250°F (121.1°C).

Minimum operating temperature is 0°F (-17.8°C).

Maximum operating pressure is 100 PSIG (689 kPa).

Minimum operating pressure is 2 PSIG (13.8 kPa).

Table of Contents

Section I: Foreword and Table of Contents  ................2

Section II: General Information  ................................2-3

Section III: Installation and Mounting Procedure  .....3-4

Section IV: Ductwork and Transitions  .........................5

Section V: Equipment Photos ...................................6-7

Section VI: Parts Drawing.........................................8-9

Section VII: Piping  ...............................................10-17

Section VIII: Control Installation and Adjustment ....18-20

Section IX: Start Up  ..................................................21

Section X: Shut Down ...............................................22

Section XI: Maintenance............................................22

SECTION II - GENERAL INFORMATION

PURPOSE

The purpose of this manual is to present a guide for 

proper installation, maintenance, and operation of 

the Wing Heating Coil, and supplement, but not to 

replace, the services of qualified field service personnel 

to supervise the initial start-up and adjustment of the 

unit. Persons without previous experience with large 

commercial and industrial heating equipment should not 

attempt the initial adjustment and checkout procedure 

which is essential before such installations may be 

considered ready for operation. This manual should be 

made readily available to all operating personnel as an 

aid in troubleshooting and proper maintenance.

SHIPPING

Base Wing coils are shipped completely assembled.  

Other large options or accessories are assembled 

and shipped mounted and wired whenever possible 

within limitations of shipping and handling. Any optional 

accessories shipped separately are shipped as 

assembled sections. Any wired accessories which have 

been disassembled for separate shipment require no 

additional conduit or wire for field reassembly. All wire 

leads will be tagged for ease of reconnection in the field.

Shipments are made F.O.B. Dallas, Texas. The unit 

is securely strapped, tied, and blocked to prevent 

shipping damage. All shipments are checked by an 

inspector before they are accepted by the carrier. 

Parts that are shipped unmounted are noted on the bill 

of lading. These parts, where feasible, are packaged 

and shipped with the units. Upon receipt of shipment, 

all units should be checked against the bill of lading to 

insure all items have been received. All equipment 

(and any optional accessories) should be checked 

carefully for physical damage in the presence of 

the carrier’s representative. If parts are missing 

or damage has occurred, a claim should be filed 

immediately with the carrier.

RECEIVING

All coils are crated at the factory for safe shipment.  

Check the unit carefully, and if damage has occurred, 

report it at once to the carrier. All claims must be made 

within 5 days of receipt of shipment. Upon receiving, 

inspect the following for damage:

1.  Damper linkage

2.  Damper motors and control linkage

3.  Finned tubes and dampers

4.  Casing, for distortion

5.  Header pipe connections

6.  Duct attachment flanges

Check the unit nameplate to insure size is correct as 

ordered.

If system tags have been used, check that proper size 

units have been tagged for correct system. (Wing will 

tag units for specific systems upon request.)

All Wing coils are given a complete operations test 

and control circuit checkout before shipment. A copy of 

the wiring diagram and bill of material is included with 

each unit shipped. If correspondence with the factory 

is necessary, please provide the unit model and serial 

number.

LIFTING AND HANDLING

Two angle lifting eyes are provided on the upper 

casing flanges on the Wing coil for lifting with overhead 

cranes. If a single chain lift is used, a “Tee” section 

spreader bar must be used to produce a vertical lift to 

prevent bending of casing flanges. Do not wrap chain 

or cable around upper header to lift unit.

All Wing coils are shipped bolted onto a wood skid so they 

can be handled by fork lift. Forks can be inserted under 

the wood skid for lifting and on site handling. Do not  lift 

coil by inserting forks under bottom header of coil. 

Содержание MV

Страница 1: ...ELS SAVE THIS MANUAL ATTENTION READ THIS MANUAL AND ALL LABELS ATTACHED TO THE UNIT CAREFULLY BEFORE ATTEMPTING TO INSTALL OPERATE OR SERVICE THESE UNITS CHECK UNIT DATA PLATE FOR STEAM OR HOT WATER REQUIREMENTS AND ELECTRICAL SPECIFICATIONS AND MAKE CERTAIN THAT THESE AGREE WITH THOSE AT POINT OF INSTALLATION RECORD THE UNIT MODEL AND SE RIAL No s IN THE SPACE PROVIDED RETAIN FOR FUTURE REFERENCE...

Страница 2: ...ipment require no additional conduit or wire for field reassembly All wire leads will be tagged for ease of reconnection in the field Shipments are made F O B Dallas Texas The unit is securely strapped tied and blocked to prevent shipping damage All shipments are checked by an inspector before they are accepted by the carrier Parts that are shipped unmounted are noted on the bill of lading These p...

Страница 3: ...mounting bracket to prevent damage to the header and tubes during shipment See Figure 1 Shipping bolts must be removed before applying steam or hot water but after all piping connections are made Failure to do so will void factory warranty Figure 1 Shipping Bolt Locations C 000703 F Remove shipping braces before attaching ductwork G Ductwork can be attached to the coil flanges or the coil can stan...

Страница 4: ...nate airflow over the supply and return headers by installing sheet metal isolation plates on the top and bottom upstream of the coils b Inlet and outlet mains should be fully insulated c To eliminate coil temperature override use slow acting on off valves to close at desired set points d The installation of humidifiers with steam manifolds internal of an air handler may provide a temperature over...

Страница 5: ...e coil resulting in poor downstream temperature control B Turning vanes must be used to assure even distribution of air over the entire coil where elbows are used in the inlet and or outlet side of a preheat coil See Figure 6 C When the coil is used as a preheat coil in conjunction with a cooling coil located downstream of the heating coil a minimum space of 36 should be allowed between this coil ...

Страница 6: ... 6 SECTION V EQUIPMENT PHOTOS Photo of Indirect Coupled VIFB Entering Air Side Photo of Indirect Coupled VIFB Leaving Air Side ...

Страница 7: ... 7 Photo of Direct Coupled VIFB Entering Air Side Photo of Direct Coupled VIFB Leaving Air Side ...

Страница 8: ... 8 SECTION VI PARTS DRAWING Enlarged View C Section A A Section D D Elevation ...

Страница 9: ...ing Bar 8 Side Panel 9 Snap Bushing 10 Return Header 11 Casing Support Channel 12 Optional Weather Proof Control Housing 13 Drive Assembly 14 Top and Bottom Panel 15 Bearing Nylon 16 Washer Special 17 Finned 5 8 Tube 18 Damper 19 Washer 1 O D 20 Palnut Fastener 21 Plain Washer 3 16 22 Rivet Brass 23 Damper Rod 24 Bearing Nylon 25 Washer 1 2 26 Retaining Clip 27 Shipping Bolts to be removed before ...

Страница 10: ...corporate a flexible connector to provide for at least 3 8 tube expansion and contraction and to allow the return header to float The integrity of the system depends in part on proper piping The following recommendations should be diligently observed Steam Systems 1 All piping in contact with airflow or inside an air hander should be insulated 2 Install casing level tubes must be vertical 3 Full s...

Страница 11: ... 11 STEAM PIPING VIFB Coil Piping Diagram 15 psig and below W12A ...

Страница 12: ... 12 STEAM PIPING VIFB Coil Piping Diagram Above 15 psig W33B ...

Страница 13: ... 13 HOT WATER PIPING VIFB Coil Piping Diagram One or Three Row Coils W13B ...

Страница 14: ... 14 HOT WATER PIPING VIFB Coil Piping Diagram Two Row Coil W32B ...

Страница 15: ... 15 STEAM PIPING MV Coil Piping Diagram 15 psig and below W27A ...

Страница 16: ... 16 STEAM PIPING MV Coil Piping Diagram Above 15 psig W28A ...

Страница 17: ... 17 HOT WATER PIPING MV Coil Piping Diagram Two Row Coil W29A ...

Страница 18: ...cated in the downstream ductwork a minimum of 3 ft away from the coil The thermostat element must be positioned across both face and by pass sections of the coil parallel to the header C Control installation instructions including diagrams are enclosed in the instruction envelope when special controls and control arrangements are ordered Typical electric and pneumatic control arrangements are indi...

Страница 19: ... 19 ELECTRIC AND PNEUMATIC CONTROLS D000756A ...

Страница 20: ...hten ball joints one on each arm connecting scissor saddle base pan arms to damper lever arm 7 With assembly now set release clamps and rotate damper lever arm until it reaches a point 1 1 2 from casing and clamp in this position Photo 3 8 Manually check to make sure that all dampers are fully closed around the coil 9 Tighten ball joints two on each side connecting base assembly to dampers 10 Remo...

Страница 21: ...3 Open steam supply line to coil and blow through coil with steam to purge coil of air and condensate 4 Feel tube surfaces to assure even heating of all surfaces before starting fans or opening outside shutoff dampers 5 Allow unit to heat soak at least 15 minutes as in step 4 6 Open dampers on the heating surface all the way by adjusting thermostats or control air pressure to units 7 Open outside ...

Страница 22: ...its and allow water to drain E Do not expose a coil which has been shut down to sub freezing air flow as water droplets in tubes may freeze resulting in coil freeze up when coil is restarted See starting instructions SECTION XI MAINTENANCE A The Wing heating coil should be periodically inspected for continuous satisfactory operation Loose nuts bolts screws and damper linkage should be tightened Cr...

Страница 23: ... 23 ...

Страница 24: ...4830 TRANSPORT DRIVE DALLAS TX 75247 TEL 214 638 6010 www ljwing com ...

Отзывы: