![Livith METAL DRY GRAPH LINE Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/livith/metal-dry-graph-line/metal-dry-graph-line_manual_1931310032.webp)
32
Remember that if the design engineer or the installer checks the need to change the frequency of
the checks by reducing the time between them, he or she has the right to intervene with a specific
note respectively in the Roofing Technical Paper or in the Installation File. Livith S.p.A. recommends to
contact always a qualified technician or Livith S.p.A. in case of extraordinary maintenance of the device.
Livith S.p.A. declines all liability due to the reusing of the system following a fall
without a complete maintenance operation.
The ordinary maintenance procedure for the fall protection systems shown in this Manual is illustrated here below:
DOCUMENT COGNITIVE
PHASE
ADDITIONAL TIPS
DOCUMENTATION AVAILABLE
CHECKS TO BE CARRIED OUT
NON-RECOVERABLE DOCUMENTATION
CHECKS TO BE CARRIED OUT
MAINTENANCE PROCEDURES
MAINTENANCE PROCEDURES
DOCUMENTATION NOT AVAILABLE
OR PARTIALLY AVAILABLE
RETRIEVED
DOCUMENTATION
Clean and waterproof
the membrane
Replace damaged/deformed
components.
Ask for replacement
labels of marking
Con
tact
Livith S.
p.A.
C
Livith S.
p.A.
Contact
Livith S.
p.A.
Retrieve the work File (Roofing Technical Paper,
Installation File, User and Manteinance Manuals of all
devices)
Or access to
smart.livith.it
and use the
QRCODE SMART
to download the included documents
Trace back to the
installer/designer/producer using
the marking and the partial
documentation available
Consult all documentation to know the
system and the specific maintenance
procedure
Visually inspect the devices and the
coverage parts where they are placed
PHASE OF THE VISUAL
INSPECTION OF THE SYSTEM
Wear and presence of corrosion of device components
Abnormal deformations of the rope or of the device components
Deformation/integrity of the fall arrest indicator
Identifiability of components through the marking
PHASE OF
INSTRUMENTAL / FUNCTIONAL
INSPECTION OF THE SYSTEM
Inspect the devices and all their
components with specific instruments
(e.g. torque wrench)
Check the rope tensioning (for type C devices).
Control the correct assembly of the system.
Verify the efficiency of possible moving parts.
View and proceed following
the product maintenance
sheet that can be downloaded
from the website www.livith.it
or by contacting Livith S.p.A
Con
tact
Revise and maintain the basic structures
and anchors as indicated in the
Installation Sheet and/or in the Roofing
Technical Paper.
DOCUMENTARY
FULFILMENTS
Provide for adequate report of the
intervention carried out
Replacement of anchor devices
and new certification
If the system has been registered with
SMART access to
smart.livith.it
scan the
QRCODE
and confirm the inspection of the system
Take note of the date of intervention on
the roof access plate, in the "last
inspection date" space and indicate the
next scheduled maintenance date in the
"next inspection date" space
Release the documentation of the
maintenance carried out
in the appropriate spaces
of the Installation File
Waterproofing in the housing area of the device
Presence of water infiltrations or dips due to possible stagnations
Presence of woodworms, molds and state
of cleanliness/degradation of the device area
Содержание METAL DRY GRAPH LINE
Страница 1: ...MANUAL METAL DRY GRAPH LINE WWW Livith IT ...
Страница 2: ...2 ...
Страница 4: ...4 ...
Страница 19: ...19 WWW LIVITH IT ...
Страница 21: ...21 WWW LIVITH IT SEE ASSEMBLY DIAGRAMS see pag 23 Cable splicing ...
Страница 33: ...33 WWW LIVITH IT ...
Страница 34: ...34 ...