27
WWW.LIVITH.IT
FILLING IN THE PLATE
An information plate must be installed near the access to the roof or fall arrest system, in
a visible place.
If this type of plate is affixed, fill it in as follows:
FIRST INSTALLATION
In "
DATE OF LAST INSPECTION
" field enter the installation date;
In "
DATE OF NEXT INSPECTION
" field enter the date of the next scheduled inspection *.
Similarly, in the event of a subsequent MAINTENANCE WORK, fill in the plate again as
follows:
In the "
DATE OF LAST INSPECTION
" field, fill in the date of the inspection carried out;
In the "
NEXT INSPECTION DATE
" field, enter the date of the next scheduled inspection *.
* To find out the frequency of periodic inspections, see the Maintenance Guide on p. 24
BASE PLATE
Содержание METAL DRY GRAPH LINE
Страница 1: ...MANUAL METAL DRY GRAPH LINE WWW Livith IT ...
Страница 2: ...2 ...
Страница 4: ...4 ...
Страница 19: ...19 WWW LIVITH IT ...
Страница 21: ...21 WWW LIVITH IT SEE ASSEMBLY DIAGRAMS see pag 23 Cable splicing ...
Страница 33: ...33 WWW LIVITH IT ...
Страница 34: ...34 ...