A-18
INSTALLATION
STEP 19 - PREPARE LEG BASES FOR UPPER
MODULE ASSEMBLY
Place a bead of liquid
sealant between all double
strip foam gaskets, then
quickly proceed to lifting
upper modules on to leg
bases.
Level the leg base assembly before
installing upper modules. After
assembly, anchor the support legs
to floor using appropriate concrete
anchors (supplied by installing
contractor)
PRISM
®
Содержание Prism 4
Страница 31: ...A 23 INSTALLATION d Reclasp filter handles FIGURE A 15 PRISM ...
Страница 77: ......