11
3. Left/Right Handrail Arms, Left/Right Foot Bars, Left/Right Foot Pedals, and Foot
Bar Covers-A/B Installation
Remove two M10x18 Hexagon Head Bolts (43), two Ø18xØ10.5x3 Spring Washers (44),
two Ø30xØ10x
δ
2.5 Washers (71), and two Ø28x5 Washers (45) from the left and right
horizontal axes of the Front Post (5). Remove bolts with the Multi Hex Tool provided.
Attach the Left Handrail Arm (3L) onto the left horizontal axis of the Front Post (5) with one
M10x18 Hexagon Head Bolt (43), one Ø18xØ10.5x3 Spring Washer (44), one
Ø30xØ10x
δ
2.5 Washer (71), and one Ø28x5 Washer (45) that were removed. Tighten
bolt with the Multi Hex Tool provided. Install a S16 Bolt Cap (49) onto the M10x18
Hexagon Head Bolt (43).
Multi Hex Tool
Allen Wrench 8mm
IMPORTANT:
Please make sure the 1/2” Left Nylon Nut
(17L) matches up with the Bolt for left U
Shape Bracket (16L) and the1/2” Right
Nylon Nut (17R) matches up with the Bolt
for right U Shape Bracket (16R).
If reversed the Nylon Nuts may become
damaged.
Multi Hex Tool with Phillips Screwdriver
S8, S13, S14, S15
Tool:
3L
79
2L
28
27
36L
29
31
26
79
33L
33R
3R
5
2R
3L
3R
5
16L
18
23
20
17L
36R
45
44
43
49
71
51
78