Section 2.
Initial assembly
This section describes how to assemble and deploy the communication system. The
following tools are required:
l
Phillips and Standard slotted screwdrivers
l
Bolt drivers or wrenches: 16 mm, 13 mm, and 8 mm (5/8", 1/8", and 5/16"
approximate SAE equivalents)
l
Post driver for antenna post
The hardware installation will take about 30 to 60 minutes. Software configuration
will take about 30 minutes to 2 hours.
Note:
We recommend that you fully assemble the system, configure your data
plan, and test the system in your office or lab before deploying it in the field.
Allow ample time to troubleshoot any issues and to verify that everything is work-
ing as expected to avoid having to make unplanned site visits.
Preparing the enclosure
In both the eddy covariance system enclosure (7900-050) and the Biomet Data
Acquisition System enclosure (7900-126), install the three strain-relief couplings in
the three bottom openings.
2-1
AirLink Cellular Communication
Содержание AirLink RV50X
Страница 1: ...Using the AirLink RV50X with LI COR Eddy Covariance and Soil Gas Flux Systems Instruction Manual ...
Страница 2: ......
Страница 6: ...iv ...
Страница 10: ...viii ...
Страница 14: ...Section 1 Introduction to the communication system 1 4 AirLink Cellular Communication ...
Страница 28: ...Section 2 Initial assembly 2 10 AirLink Cellular Communication ...
Страница 36: ...Section 3 Configuring instrument IP addresses 3 8 AirLink Cellular Communication ...
Страница 52: ...Section 4 Configuring the RV50X 4 16 AirLink Cellular Communication ...
Страница 66: ...Section 6 Troubleshooting 6 4 AirLink Cellular Communication ...
Страница 68: ...Section 7 Maintenance 7 2 AirLink Cellular Communication ...
Страница 89: ......