—24—
8. Checking a gas leakage
(1) Connect the manifold gauge to the service port of 3-way valve.
Measure the pressure.
(2) Keep it for 5-10 minutes.
Ensure if the pressure indicated on the gauge is as same as that of measured at first time.
NOTE:
The additional gas for air purping has been charged in the outdoor unit.
However, if the flare connections have not been done correctly and there gas leaks, a gas cylinder and the
charge set will be needed.
CAUTION: Do not leak the gas in the air during Air purging, with vacumm pump are possible as you can.
Indoor unit
Outdoor unit
Closed
Liquid side
CLOSE
Closed
Gas side
CLOSE
Содержание LS-H0560CL
Страница 52: ...Memo 52 ...
Страница 53: ...P No 3828A30033C July 2003 Printed in Korea ...