5-10
COMPONENTS
TEST PROCEDURE
RESULTS
RELAY 2
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
1
2
3
4
5
6
7
8
9
10
4 sec
6 sec
8 sec
10 sec
12 sec
14 sec
16 sec
18 sec
20 sec
22 sec
18 sec
16 sec
14 sec
12 sec
10 sec
8 sec
6 sec
4 sec
2 sec
0 sec
POWER
LEVEL
Relay 2
B
A
Measure the resistance.
(Ohm-meter scale: R x 1)
Check for continuity of relay 2 with an
ohm-meter.
(Remove wire leads from relay 2 and
operate the unit.)
Measure the resistance.
(Ohm-meter scale: R x 1)
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS SERVICED
FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE CONNECTOR,
NOT THE WIRES.
Normal:
A:Approx. 85 ~ 100 ohm.
B:Approx. 10 ~ 25 ohm.
Abnormal: Infinite or several
ohm.
Normal: Approx. 100 ~ 150 ohm
Abnormal: Infinite or several
ohm.
Содержание LMAB1240ST
Страница 28: ...DOOR PARTS 6 2 13552A 13213A 13352A 13581A 14970A 14026A 15006A 13536A 13551A EV ...
Страница 29: ...CONTROL PANEL PARTS 6 3 24781M 23551A 23550D 24510L 24970A 23551B 268711 WTP018 24930D EV ...
Страница 30: ...OVEN CAVITY PARTS 6 4 36549S 33052A WTP013 33390G WTT010 WSZ185 33112U 35889A EV ...
Страница 31: ...LARCH BOARD PARTS 6 5 WSZ085 466001 466003 466001 43500A EV ...
Страница 34: ...BASE PLATE PARTS 6 8 56170D 63302A 63303A WTT021 WSZ002 WTT028 647781 948502 EV ...
Страница 35: ......