5-10
COMPONENTS
TEST PROCEDURE
RESULTS
RELAY 2
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
Check for continuity of relay 2 with an
ohm-meter.
(Remove wire leads from relay 2 and
operate the unit.)
Measure the resistance.
(Ohm-meter scale: R x 1)
Measure the resistance.
(Ohm-meter scale: R x 1 )
POWER
LEVEL
1
4 sec
18 sec
2
6 sec
16 sec
3
8 sec
14 sec
4
10 sec
12 sec
5
12 sec
10 sec
6
14 sec
8 sec
7
16 sec
6 sec
8
18 sec
4 sec
9
20 sec
2 sec
10
22 sec
0 sec
Normal:
A: Approx. 85 ~ 100 ohm.
B: Approx. 10 ~ 25 ohm.
Abnormal: Infinite or several
ohm.
Normal: Approx.100~150 ohm
Abnormal: Infinite or several
ohm.
Relay 2
A
B
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS SERVICED
FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE CONNECTOR,
NOT THE WIRES.
Содержание GoldStar MS-106YG
Страница 27: ...6 2 13352A 13720D 14970A 13581A 14026A 13536A 15006A 13552A 13213A DOOR PARTS EV ...
Страница 28: ...6 3 CONTROLLER PARTS 24781M 23506A 23572A WTT028 23550D WTP018 268711 24510L 24970A 250201 EV ...
Страница 29: ...6 4 36549S 33052A WTP013 33390G WTT010 WTT021 33112U 35889A OVEN CAVITY PARTS EV ...
Страница 30: ...6 5 43500A 466001 WSZ085 466001 466003 LATCH BOARD PARTS EV ...
Страница 32: ...6 7 56170D WTT021 63302A WSZ002 948501 WTT028 647781 63303A BASE PLATE PARTS EV ...
Страница 33: ...8 1 SCHEMATIC DIAGRAM OF P C B ...
Страница 34: ...8 2 PRINTED CIRCUIT BOARD ...
Страница 35: ......