- 44 -
Copyright ©2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
Installation
- B1, B2 Chassis
Installation of Unit
Install the unit above the ceiling correctly.
• Apply a joint-canvas between the unit and duct to absorb
unnecessary vibration.
• Apply a filter Accessory at air return hole.
• Install the unit leaning to a drainage hole side as a figure
for easy water drainage.
• A place where the unit will be leveled and that can support
the weight of the unit.
• A place where the unit can withstand its vibration.
• A place where service can be easily performed.
CASE 1
POSITION OF SUSPENSION BOLT
(Unit:mm)
9/12k BTU/h
850
900
383
570
93.5
190
20.6
795
163
18/24k BTU/h 1130 1180
383
570
93.5
190
20.6 1065 163
Dimension
Capacity
A
B
C
D
E
F
G
H
I
C
E
G
D
A
B
M10 Nut
M10 SP. washer
M10 washer
X 4
X 4
(Local
supply)
X 4
M10 Nut
M10 SP. washer
M10 washer
X 4
X 4
(Local
supply)
X 4
1/100
I
F
H
Drainage hole
CASE 2
POSITION OF CONSOLE BOLT
Содержание A2UW146FA0
Страница 254: ...P NO 3828A20097W NOVEMBER 2007 ...