- 119 -
Copyright ©2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
Control Devices and Function
Vcc
C
D
GND
Out door unit Terminal Block
Wire Color
Central Control Terminal
GND
BLUE
GND
Vcc
Red
Vcc
C
D
C
Brown
D
Yellow
■
INSTALLATION ORDER
■
LINK OF CONNECTING WIRE
1.
First, separate the front case from rear case of controller, connect terminal
C, D,Vcc, GND on PCB referring to the following table.
Maximum length of connecting wire
• Between controller and outdoor unit : 220m(25
Ω
)
• Between controllers : 220m(25
Ω
)
2.
After attaching the supplied wire to terminal, link the connecting wire.
If necessary, Cut the indicated part of front case to draw the lead wire.
1.
Remove upper & lower case.
2.
Fixate screw in the holes of the
case bottom.
3.
For Dip switch, and Rotary
switch setting, refer to the page
“How to Install”.
4.
For wiring connection, refer page
“Installation Procedure”
5.
Adjust the upper case in accor-
dance with back case while
assembling as shown in the fig-
ure.
6.
Check the operation by supply-
ing the power.
Содержание A2UW146FA0
Страница 254: ...P NO 3828A20097W NOVEMBER 2007 ...