3-1
Chapter 3: Installing the Switch
Selecting a Site
Switch units can be mounted in a standard 19-inch equipment rack or on a flat
surface. Be sure to follow the guidelines below when choosing a location.
• The site should:
- be at the center of all the devices you want to link and near a power outlet.
- be able to maintain its temperature within 0 to 40 °C (32 to 104 °F) and its
humidity within 5% to 95%, non-condensing
- provide adequate space (approximately two inches) on all sides for proper air
flow
- be accessible for installing, cabling and maintaining the devices
- allow the status LEDs to be clearly visible
• Make sure twisted-pair cable is always routed away from power lines, fluorescent
lighting fixtures and other sources of electrical interference, such as radios and
transmitters.
• Make sure that the unit is connected to a separate grounded power outlet that
provides 100 to 240 VAC, 50 to 60 Hz, is within 2 m (6.6 feet) of each device and
is powered from an independent circuit breaker. As with any equipment, using a
filter or surge suppressor is recommended.
Ethernet Cabling
To ensure proper operation when installing the switch into a network, make sure that
the current cables are suitable for 10BASE-T, 100BASE-TX or 1000BASE-T
operation. Check the following criteria against the current installation of your
network:
• Cable type: Unshielded twisted pair (UTP) or shielded twisted pair (STP) cables
with RJ-45 connectors; Category 3 or better for 10BASE-T, Category 5 or better
for 100BASE-TX, and Category 5, 5e or 6 for 1000BASE-T.
• Protection from radio frequency interference emissions
• Electrical surge suppression
• Separation of electrical wires (switch related or other) and electromagnetic fields
from data based network wiring
• Safe connections with no damaged cables, connectors or shields
Содержание GSW-2692
Страница 1: ...LevelOne GSW 2692 24 Port 10 100M 2G Combo L2 Stackable Switch Installation Guide Version 1 0 0608...
Страница 2: ......
Страница 20: ...Introduction 1 8 1...
Страница 36: ...Installing the Switch 3 10 3...
Страница 44: ...Making Network Connections 4 8 4...
Страница 54: ...Specifications C 4 C...
Страница 61: ...Index Index 3 tagging 2 5 W web based management 1 2...
Страница 62: ...Index Index 4...
Страница 63: ......
Страница 64: ...GSW 2692 E072006 JC R01...