Installing the Switch
3-2
3
Figure 3-1 RJ-45 Connections
Equipment Checklist
After unpacking this switch, check the contents to be sure you have received all the
components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.
Package Contents
• GSW-2692
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
• Power Cord
• RS-232 console cable
• CD Manual/Management Guide
Optional Rack-Mounting Equipment
If you plan to rack-mount the switch, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are not
included
• A screwdriver
R
J-45
C
onnector
Содержание GSW-2692
Страница 1: ...LevelOne GSW 2692 24 Port 10 100M 2G Combo L2 Stackable Switch Installation Guide Version 1 0 0608...
Страница 2: ......
Страница 20: ...Introduction 1 8 1...
Страница 36: ...Installing the Switch 3 10 3...
Страница 44: ...Making Network Connections 4 8 4...
Страница 54: ...Specifications C 4 C...
Страница 61: ...Index Index 3 tagging 2 5 W web based management 1 2...
Страница 62: ...Index Index 4...
Страница 63: ......
Страница 64: ...GSW 2692 E072006 JC R01...