
[Fg. 13]
[Fg. 12]
STEP 10:
STEP 9:
Lay the removed end gate face down.
Remove one (1) existing Nylock Nut and one
(1) existing Flat Washer on
each
side of the
End Gate Bracket as shown.
NOTE:
The Washer and Nut should be those
closest to the curved bottom of the End Gate.
Reinstall the Nylock Nuts and Washers with
the
loop end
of each End Gate Table Cable
[O]
sandwiched underneath the washer
against the End Gate U-Tube. [Fg. 14-15]
OPTIONAL:
To position the End Gate to the
side of the trailer for use as a side table, also
install the End Gate Table Cables (2)
[P].
[Fg. 14-15]
Using the hardware set aside in step 8 install
the End Gate Hinges
[Q]
in the Trailer Frame
Tubes as shown.
[Fg. 12-13]
END GATE
NYLOCK NUT &
WASHER
[Fg. 14]
[Fg. 15]
O
P
O
Q
P
O
P
Page 5 of 10