
1.
Disconnect
Motor
Connectors.
2.
If
the
control
box
is
mounted
to
the
mixing
valve,
remove
it
along
with
the
mounting
bracket.
Place
in
a
safe
location
without
putting
tension
on
sensor
wires.
3.
Remove
the
aluminum
guarding
and
cover
screws
from
cover
assembly.
4.
Remove
complete
cover
assembly.
Do
not
remove
motor
assembly
at
this
time.
5.
Turn
the
cover
assembly
on
its
side.
While
securing
the
hex
‐
coupling
under
the
motor
mounting
plate,
remove
the
nut,
lock
washer
and
shuttle
from
the
control
stem.
6.
Inspect
the
shuttle
and
clean
any
sediment
or
debris
that
has
built
up.
Replace
O
‐
ring
if
necessary.
7.
Inspect
and
clean
all
surfaces
of
the
cover.
Replace
cover
O
‐
rings
if
necessary.
7A.
If
a
new
Teflon®
gasket
is
required,
remove
the
locking
disk
(special
tool
required)
and
then
the
damaged
gasket.
Press
the
replacement
disk
into
the
groove
evenly.
NOTE:
For
best
results,
remove
motor
assembly
from
cover
by
unthreading
the
4
bolts
on
top
of
the
assembly
.
34
SERVICING
INSTRUCTIONS
WARNING:
Before
servicing
Nucleus
series
valves,
be
sure
to
shut
down
inlet
hot,
cold
and
outlet
water
supplies
and
power
down
the
Nucleus
control
box.
Failure
to
do
so
could
result
in
damage
to
the
control
box
and
could
cause
injury
and/or
death
to
the
service
technician
.