© Copyright 2015 Lenovo
Chapter 2: Installing and Removing the EN4093R
19
9. Make sure that LEDs on the switch indicate that it is operating correctly (see
“Information LEDs” on page 30
).
10. If you have another switch to install, repeat
Step 3
through
Step 9
; otherwise,
go to the next step.
11. Install any port transceiver modules or Direct-Attach Cables (DACs) needed for
the switch. For information and instructions, see
“Connecting Switch Ports” on
page 21
and the documentation that comes with the transceiver modules or
DACs.
12. Attach any cables that are required by the switch. For additional information
about cabling the switch, see
“Connecting Switch Ports” on page 21
, the
documentation that comes with the port transceiver modules, DACs, cables,
and the optional network devices to which the cables are connected.
13. Make sure that the data (non-management) ports on the switch are enabled
through the Chassis Management Module (CMM).