Figure 119. Connecting the cable to the RAID adapter
Install the top cover
Follow instructions in this section to install the server top cover.
About this task
S014
CAUTION:
Hazardous voltage, current, and energy levels might be present. Only a qualified service technician is
authorized to remove the covers where the label is attached.
S033
CAUTION:
Hazardous energy present. Voltages with hazardous energy might cause heating when shorted with
metal, which might result in spattered metal, burns, or both.
Watch the procedure
. A video of this procedure is available from the following links:
•
https://www.youtube.com/playlist?list=PLYV5R7hVcs-C6QgmsUMRG6ul0bHzrGmsG
•
https://list.youku.com/albumlist/show/id_54461099
Procedure
Step 1. Install the top cover.
222
ThinkSystem SR860 V2Setup Guide
Содержание 7X59
Страница 1: ...ThinkSystem SR860 V2 Setup Guide Machine Types 7X59 and 7X60 ...
Страница 8: ...vi ThinkSystem SR860 V2Setup Guide ...
Страница 50: ...42 ThinkSystem SR860 V2Setup Guide ...
Страница 79: ...5 0 1 2 3 1100 mm C0 C1 Slot 10 6 4 5 6 7 1100 mm C0 C1 Slot 12 Chapter 3 Internal cable routing 71 ...
Страница 132: ...124 ThinkSystem SR860 V2Setup Guide ...
Страница 136: ...128 ThinkSystem SR860 V2Setup Guide ...
Страница 154: ...146 ThinkSystem SR860 V2Setup Guide ...
Страница 250: ...242 ThinkSystem SR860 V2Setup Guide ...
Страница 254: ...246 ThinkSystem SR860 V2Setup Guide ...
Страница 258: ...250 ThinkSystem SR860 V2Setup Guide ...
Страница 259: ......
Страница 260: ......