Figure 128. Top cover locking/unlocking direction
1
Unlocking direction
2
Locking direction
After this task is completed
Proceed to complete the parts replacement (see “Complete the parts replacement” on page 218).
Complete the parts replacement
Go through this checklist before completing parts replacement.
To complete parts replacement, go through the following list:
1. Ensure that all the removed components have been properly reinstalled and that no tools or loose
screws are left inside your server.
2. Properly route and secure the cables in the server. Refer to the cable connecting and routing information
for each component.
3. Make sure to install one of the following:
• With two installed processors: system air baffle.
• With four installed processors:
– Processor and memory expansion tray
–
Expansion tray air baffle
and
upper expansion tray air baffle
218
ThinkSystem SR850 V2 Maintenance Manual
Содержание 7D31
Страница 1: ...ThinkSystem SR850 V2 Maintenance Manual Machine Types 7D31 and 7D32 ...
Страница 8: ...vi ThinkSystem SR850 V2 Maintenance Manual ...
Страница 52: ...44 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 60: ... Three backplanes on page 57 52 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 70: ...62 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 71: ...Chapter 3 Internal cable routing 63 ...
Страница 78: ...70 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 114: ...106 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 227: ...Figure 129 Installing the air baffle to the system board Chapter 4 Hardware replacement procedures 219 ...
Страница 236: ...Figure 133 System board and expansion board LEDs 228 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 258: ...250 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 260: ...252 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 264: ...256 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 273: ......
Страница 274: ......