Step 1. Make sure the expansion tray air baffle is installed on the system board. If not, install it.
Attention:
Air baffle is required for airflow that creates proper cooling. Make sure to install proper
air baffles for system configuration before the power is turned on.
Figure 110. Installing the expansion tray air baffle
Step 2. Align the processor and memory expansion tray with the two pairs of guides on the sides, and
lower it into the chassis.
.
Hardware replacement procedures
195
Содержание 7D31
Страница 1: ...ThinkSystem SR850 V2 Maintenance Manual Machine Types 7D31 and 7D32 ...
Страница 8: ...vi ThinkSystem SR850 V2 Maintenance Manual ...
Страница 52: ...44 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 60: ... Three backplanes on page 57 52 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 70: ...62 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 71: ...Chapter 3 Internal cable routing 63 ...
Страница 78: ...70 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 114: ...106 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 227: ...Figure 129 Installing the air baffle to the system board Chapter 4 Hardware replacement procedures 219 ...
Страница 236: ...Figure 133 System board and expansion board LEDs 228 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 258: ...250 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 260: ...252 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 264: ...256 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 273: ......
Страница 274: ......