GUIDE SPECIFICATIONS
TS − 3 to 5 Ton R−410A Air Conditioners
/ Page 20
PART 1.03
SYSTEM DESCRIPTION
A.
Performance Requirements:
Specifier Note: Refer to Lennox Engineering Handbook for specific heating and cooling capacities. Units are available in 3,
3.5, 4 and 5 ton models. Cooling capacities vary from 33,400 to 62,500 Btuh.
1.
3, 3.5, 4 and 5 ton capacity
2.
Electrical Characteristics:
a.
60 hz
b.
3−phase
Specifier Note: The 575 V option below is only available on the 4 and 5 ton Lennox TS with R−410A and 3, 4 and 5 ton
Lennox TS with R−22.
c.
[208/230 V] [460 V] [575 V]
Specifier Note: Article below includes submittal of relevant data to be furnished by Contractor before, during or after
construction. Coordinate this article with Architect’s and Contractor’s duties and responsibilities in Conditions of the
Contract and Division 01 Submittal Procedures Section.
PART 1.04
SUBMITTALS
A.
General: Submit listed submittals in accordance with Conditions of the Contract and Division 01 Submittal Procedures.
B.
Product Data: Submit product data for specified products.
C.
Shop Drawings:
1.
Submit shop drawings in accordance with Section
[01 33 00 − Submittal Procedures] [_____]
.
2.
Indicate:
a.
Equipment, piping and connections, together with valves, strainers, control assemblies, thermostatic controls,
auxiliaries and hardware, and recommended ancillaries that are mounted, wired and piped ready for final
connection to building system, its size and recommended bypass connections.
b.
Piping, valves and fittings shipped loose showing final location in assembly.
c.
Control equipment shipped loose, showing final location in assembly.
d.
Field wiring diagrams.
e.
Dimensions, internal and external construction details, installation clearances, recommended method of
installation, sizes and location of mounting bolt holes.
f.
Detailed composite wiring diagrams for control systems showing factory installed wiring and equipment on split
systems or required for controlling devices or ancillaries, accessories, controllers.
D.
Quality Assurance:
1.
Test Reports: Certified test reports showing compliance with specified performance characteristics and physical
properties.
2.
Certificates: Product certificates signed by manufacturer certifying materials comply with specified performance
characteristics and criteria and physical requirements.
3.
Manufacturer’s Instructions: Manufacturer’s installation instructions.
Specifier Note: Coordinate paragraph below with Part 3 Field Quality Requirements Article. Retain or delete as applicable
.
E.
Manufacturer’s Field Reports: Manufacturer’s field reports specified.
F.
Closeout Submittals: Submit the following:
1.
Warranty: Warranty documents specified.
2.
Operation and Maintenance Data: Operation and maintenance data for installed products in accordance with
Division 01 Closeout Submittals (Maintenance Data and Operation Data) Section. Include methods for maintaining
installed products, and precautions against cleaning materials and methods detrimental to finishes and performance.
Include names and addresses of spare part suppliers.
3.
Provide brief description of unit, with details of function, operation, control and component service.
4.
Commissioning Report: Submit commissioning reports, report forms and schematics in accordance with Section
[01 91 00 − Commissioning] [______]
.