background image

Page 11

VARIABLE SPEED CHECKOUT

Using the transformer in the unit, test motor operation by jumping 24 volts
into the terminals illustrated below for the desired speed.

LOW (continuous blower) SPEED

1 2

3 4 5 6

7 8

9 10 11 12 13

J46

R

C

To Y" on ignition control. 

!

1. Disconnect power to unit.
2. Disconnect plug J46 from P46 located on the

blower control board.

3. Disconnect C and R from ignition control

board.

4. Disconnect Y" from ignition control and con-

nect a separate wire between R" on the
transformer and Y" on the ignition control.

5. Connect voltage source as shown above.
6. Turn on power to unit. Blower should operate

at LOW speed.

COOLING SPEED

J46

R

C

7− Disconnect power to unit.
8− Connect voltage source as shown above.
9− Disconnect Y" on ignition control and con-

nect a separate wire between R" on trans-
former and Y" on ignition control.

10− Turn on power to unit. Blower should oper-

ate at COOLING speed.

To Y" on ignition control.

HEATING SPEED

11− Disconnect power to unit.
12− Connect voltage source as shown above.
13− Disconnect W" from ignition control and

connect a separate wire between R" on
transformer and W" on the ignition control.

14− Turn on power to unit. Blower should operate

at HEATING speed.

J46

R

C

To W" on on ignition control.

J46

R

C

15− Disconnect power to unit.
16− Connect voltage source as shown above.
17− Disconnect W2" from ignition control and

connect a separate wire between R" on
transformer and W2" on ignition control.

18− Turn on power to unit. Blower should operate

at HIGH HEATING speed.

To W2" on ignition control.

HIGH HEATING SPEED

14 1516

1 2

3 4 5 6

7 8

9 10 11 12 13 14 1516

1 2

3 4 5 6

7 8

9 10 11 12 13 14 1516

14 1516

1 2

3 4 5 6

7 8

9 10 11 12 13

J49 CONTROL CONNECTOR

VOLTAGE

WHEN VOLTAGE IS PRESENT

PIN 1

C1

Common

Low voltage transformer is powered

PIN 2

W / W1

24VAC

W1 (1st stage heating) call from thermostat

PIN 3

C2

Common

Low voltage transformer is powered

PIN 4

Delay

see note 

1

Low voltage transformer is powered

PIN 5

Cool

see note 

1

Low voltage transformer is powered

PIN 6

Y1

24VAC

Y (cooling) call from thermostat

PIN 7

Adjust

see note 

1

Low voltage transformer is powered

PIN 8

Out

Motor sends pulse signals between pin 8 and pin 16 to signal CFM

PIN 9

O

24VAC

From thermostat (in heat pump application)

PIN 10

DS / PWM

0 / 24 VAC

Low voltage is transformer is powered and humidistat operation:
24VAC = normal humidity, 0VAC = high humidity (reduced CFM)

PIN 11

Heat

see note 

1

Low voltage transformer powered

PIN 12

R

24VAC

Low voltage transformer is powered

PIN 13

EM / W2

24VAC

W2 (2nd stage heating) call from thermostat

PIN 14

Y / Y2

Not used on single stage cooling

PIN 15

G

24VAC

G is present from thermostat

PIN 16

Out

Motor sends pulse signals between pin 8 and 16 to signal CFM

1

 signal from selection taps − A tap = 0 volts, B and C taps = half wave, D tap = 24VAC

Содержание Residential Packaged Cooling System 15CHAX

Страница 1: ...ways use service equipment rated for R 410A WARNING Improper installation adjustment alteration service or maintenance can cause property damage person al injury or loss of life Installation and servi...

Страница 2: ...0 hz 208 230V 1ph 60hz OPTIONAL ACCESSORIES MUST BE ORDERED EXTRA Compressor Crankcase Heater 93M04 S S S S S S Compressor Hard Start Kit 10J42 S S S S S p 81J69 S Compressor Time Off Control 47J27 S...

Страница 3: ...r Amps 2 2 2 2 2 2 4 4 4 Indoor Bl M t Rated Load Amps 1 5 1 5 1 5 2 7 2 7 2 7 Blower Motor Locked Rotor Amps 3 3 4 5 5 5 1 Maximum O t Unit only no electric heat 30 30 30 40 50 60 Overcurrent Protect...

Страница 4: ...Page 4 FIGURE 1 15CHAX PARTS ARRANGEMENT FIGURE 2 15CHAX CONTROL BOX DUAL FAN CAPACITOR C12 TRANSFORMER T1 CONTACTOR K1 BLOWER CONTROL A54 SYSTEM OPERATION MONITOR A132...

Страница 5: ...mode See figure 4 Factory settings for the blower speed jumpers are given in the wiring diagram Figure 4 shows the blower control board Use tables 1 2 and 3 to determine the correct air vol ume for op...

Страница 6: ...activated only when W is energized In the backup heat mode the blower continues to operate for 2 minutes after the heating demand is satisfied NOTE Due to the nature of electric heat CFM settings are...

Страница 7: ...0 975 1840 870 1610 760 1380 650 1610 760 1610 760 1610 760 1610 760 1035 490 920 435 805 380 690 325 NORM 1800 850 1600 755 1400 660 1200 565 1400 660 1400 660 1400 660 1400 660 900 425 800 380 700 3...

Страница 8: ...enser fan is not running 4 Return air duct has substantial leakage 5 If low pressure switch is present see Flash Code 1 info Yellow Alert Flash Code 3 Short Cycling Compres sor is running only briefly...

Страница 9: ...the Harmony zone control system Lennox Signatu reStatt or a conventional thermostat Motor rpm is continually adjusted internally to maintain constant static pressure against the blower wheel The cont...

Страница 10: ...ONTROL CONNECTOR J49 BLOWER B3 HARNESS CONNECTORS J49 PIN 1 C1 PIN 2 W W1 PIN 3 C2 PIN 4 Delay PIN 5 Cool PIN 6 Y1 PIN 7 Adjust PIN 8 0ut PIN 9 0 PIN 10 DS PWM PIN 11 Heat PIN 12 R PIN 13 EM W2 PIN 14...

Страница 11: ...rce as shown above 17 Disconnect W2 from ignition control and connect a separate wire between R on transformer and W2 on ignition control 18 Turn on power to unit Blower should operate at HIGH HEATING...

Страница 12: ...the two scrolls fig ure figure 11 1 The centrifugal action of the orbiting scroll seals off the flanks of the scrolls figure 11 2 As the orbiting motion continues the gas is forced toward the center...

Страница 13: ...limits will automatically close when temperatures return to normal Limit rating will be on front side 2 Heating Element HE1 through HE4 Heating elements are composed of helix wound bare nich rome wire...

Страница 14: ...Suction 140 140 140 141 141 141 142 142 143 144 145 147 15CHAX 48 140 141 142 144 144 145 146 147 148 149 150 151 15CHAX 60 143 144 145 146 146 147 147 148 149 150 151 152 15CHAX 24 219 242 264 287 29...

Страница 15: ...Page 15 VI Wiring Diagram and Sequence of Operation A Unit Diagram...

Страница 16: ...E ELECTRIC HEAT 2ND STAGE 1 1 4 4 3 3 5 5 BLU BLU 1 1 2 2 3 3 4 4 5 5 6 6 208 240 208 240 VOLTAGE VOLTAGE BY OTHERS BY OTHERS BLK BLK YEL YEL RED RED BLU BLU WHT WHT BLK BLK 6 PIN 6 PIN PLUG PLUG Wiri...

Отзывы: