background image

Page 25

 208/230V-1PH,60HZ

Description

DS1 (GREEN)

DS2 (RED)

No Power to Control

OFF

OFF

Normal Operation / Power to

Control

Simultaneous Slow Flash

Anti-Short Cycle Lockout

Alternate Slow Flash

Low Pressure Switch Fault

OFF

Slow Flash

Low Pressure Switch Lockout

OFF

ON

High Pressure Switch Fault

Slow Flash

OFF

High Pressure Switch Lockout

ON

OFF

G

W1

C

R

O

THERMOSTAT

L1

T1

T2

L2

C

H

F

DUAL

CAPACITOR

COMPRESSOR

C

S

R

537661-01

CONNECTION DIAGRAM, HEAT PUMP

CONSTANT TORQUE BLOWER, SINGLE PHASE

RED

BLK

208V

240V

24V

INDOOR

BLOWER

MOTOR

NOTE:

  IF ANY OF THE ORIGINAL

  WIRE IS REPLACED THE

  SAME SIZE AND TYPE WIRE

  MUST BE USED.

  USE COPPER CONDUCTOR

  ONLY, MIN 75

C WIRE

 

 

LINE VOLTAGE FIELD INSTALLED

WARNING-

ELECTRIC SHOCK HAZARD. UNIT

MUST BE GROUNDED IN ACCORDANCE

WITH NATIONAL AND LOCAL CODES.

BLU

YEL

NC

C

W1

C

L

R

O

Y1

FAN

O-OUT

LO-PS

DF

HI-PS

COMMON

Y1 OUT

24 V

Y

RED

YEL

BLU

WHT

GRN

ORG

DIAGNOSTIC CODES FOR DEFROST CONTROL LEDS

Note: Because the Pressure Switches are monitored only when "Y1" (Input) is active, the code

for pressure switch open will not be seen when "Y1" is off. Instead, the "Normal Operation" or

"Anti Short Cycle" code will be seen.

 

Also, when a pressure switch opens and caused a short cycle lockout, the pressure switch-open

code will be seen until it closes, then the short cycle lockout code will flash unless it has already

expired.

W1 & W2 CAN BE USED TO STAGE

ELECTRIC HEAT ACCESSORY ON

10, 15 & 20KW MODELS

5 & 7.5 KW HEATER ACCESSORIES

FUNCTION OFF W1 ONLY.

BLK

DEFROST

CONTROL

WHT

DEFROST

CONTROL

J2-2

J2-4

BLK

C

1

2

3

4

5

WHT

BLU

RED

BLU

WHT

L

N

G

NOTE: TAP1 FOR FAN ONLY

TAP 2 FOR COOLING

TAP3 FOR HIGH STATIC COOLING

TAP4 AND TAP5 FOR ELECTRIC HEAT- REFER TO HEATING LABEL

TRANSFORMER

L

G

N

BLK

CONTACTOR

BLK

YEL W/STRIPE

CONTACTOR

(See instructions or markings on System Diagnostic

Module for codes of System Diagnostic Module)

BLK

BLU

WHT

FAN

YEL

YEL W/STRIPE

K1-2

K1-1

J2-1

B1

CMC1

C12

GRY

ORG

BLK

CONDENSER

FAN MOTOR

PUR

J1-2

J1-1

J1-3

B4

B3

CONTACTOR

K1

HIGH PRESSURE

SWITCH

THERMAL PROTECTION

SWITCH

(IF USED)

S173

S4

J1-11

J1-12

REV. VALVE

DEFROST

T'STAT

LOW PRESSURE

SWITCH

GRY

GRY

BLK

BLK

BRN

BRN

L1

S79

S6

J1-5

J1-6

J1-8

J1-9

J1-7

J1-10

YEL

T1

BLU

YEL

J2-6

J2-5

S1

CONTROL CIRCUIT WIRING TO

BE 24 VOLT, NEC CLASS-2

CMC1

J1: PLUG THROUGH CONTROL PANEL (12 PIN)

J2: PLUG FOR ACCESSORY HEAT (6 PIN)

INDOOR BLOWER MOTOR

GRN

FLOAT SWITCH

(IF USED)

YEL

YEL

CRANK

CASE

HEATER

(IF USED)

BLK

BLK

HR1

Figure 13. Connections Diagram - Heat Pump Constant Torque

Содержание LRP14AC Series

Страница 1: ...LRP14AC LRP14HP 22 Wiring Diagrams LRP14AC LRP14HP 24 2021 Lennox Industries Inc Dallas Texas USA WARNING Improper installation adjustment alteration service or maintenance can cause property damage p...

Страница 2: ...13 44 13 44 14 32 16 06 6 20 40 89 21 63 13 21 TYPICAL DRAIN LOCATION CONDENSATE DRAIN 3 4 NPT 5 75 3 55 4 12 TYPICAL VENT HOOD SIDE VIEWS 11 49 2 33 47 66 1 98 16 77 2 48 14 02 47 66 POWER ENTRY GAS...

Страница 3: ...RY 7 8 DIA KNOCKOUT GAS SUPPLY 44 89 21 63 13 21 TYPICAL DRAIN LOCATION CONDENSATE DRAIN 3 4 NPT 5 75 3 55 4 12 TYPICAL VENT HOOD SIDE VIEWS TOP VIEW POWER ENTRY GAS ENTRY RETURN AIR 2 11 19 49 2 39 2...

Страница 4: ...1127 44 3 8 1127 16 7 8 429 13 7 8 352 2 1 8 54 11 1 2 287 SUPPLY OPENING RETURN OPENING 8 203 14 356 18 457 24 610 3 4 19 1 25 5 1 2 140 5 3 4 146 11 1 2 287 17 1 4 438 1 3 8 35 3 3 4 95 13 330 3 76...

Страница 5: ...76 x 330 mm 52 7 8 1343 44 3 8 1127 19 1 2 380 11 1 2 287 19 1 2 380 2 1 8 54 11 1 2 287 SUPPLY OPENING RETURN OPENING 8 203 14 356 18 457 24 610 3 3 4 95 22 7 8 581 7 178 3 4 19 1 25 NOTE If bottom e...

Страница 6: ...Minimum Height 4 102 UNIT BASE RAIL CLIPS 4 ADJUSTABLE PITCH ROOF CURB Usage A B C in mm in mm in mm 24 30 36 42 7 8 1089 13 7 8 352 16 7 8 429 42 48 60 51 3 8 1305 19 1 2 495 19 1 2 495 NOTE Roof dec...

Страница 7: ...arate request for inspection by the carrier s agent should be made in writing Location Use the following guidelines to select a suitable location for these units 1 Unit is designed for outdoor install...

Страница 8: ...t condenser air discharge outlet combustion air inlet or vent outlet Clearance to Combustibles Clearance for Service Access Front of unit 0 in 24 in Back of unit 0 in 0 in Left side 0 in 24 in Right s...

Страница 9: ...lated Vent Hood Installation The unit is shipped with the vent hood inside the control compartment Locate the vent hood and attach to side of utility panel with screws provided in the instruction bag...

Страница 10: ...SI Z223 1 latest edition or CAN CGA B149 1 2 Canadian Installation Codes to correct improper operation of common venting system Duct System The duct system should be designed and sized according to th...

Страница 11: ...ly upstream of the gas supply connection to the furnace Gas Connection The gas supply line is routed through the gas entry location on the side of the unit see Figure 4 A grommet is provided in the in...

Страница 12: ...adian Electrical Code Part 1 CSA C22 1 latest edition or local codes where they prevail Use wiring with a temperature limitation of 75 C minimum Run the 208 or 230 volt 60 hertz electric power supply...

Страница 13: ...uld be used to connect the thermostat to the unit Heating Start Up For Your Safety Read Before Lighting Furnace is equipped with a direct ignition control Do not attempt to manually light the burners...

Страница 14: ...he gas can be obtained from the local utility BTU HR Input Cubic Feet per Revolution x 3600 x Heating Value Seconds per Revolution For example by actual measurement it takes 38 seconds for the hand on...

Страница 15: ...inuous Fan With the proper thermostat and sub base continuous blower operation is possible by closing the R to G circuit Cooling blower delay is also functional in this mode 5 To change orifice a Remo...

Страница 16: ...dequate airflow occurs This closes the main gas valve Pressure Switch If the combustion air blower should fail the pressure switch prevents the spark electrode and gas valve from being energized Maint...

Страница 17: ...rder they were removed in Steps 1 through 3 10 When replacing the flue collector box be careful so as not to tear the adjoining insulation 11 Assure that all joints on the vent side of the combustion...

Страница 18: ...Page 18 Figure 8 Wiring Diagram Single Phase CT Wiring Diagram LRP14GE...

Страница 19: ...unit is fully equipped for cooling operation without auxiliary heat A heater kit accessory may also be used To install the heater kit accessory see Figure 7 1 Disconnect the power and open the main co...

Страница 20: ...from normal heating operation to defrost mode and back During the compressor cycle call for defrost the control accumulates compressor run time at 30 60 90 minute field adjustable intervals If the def...

Страница 21: ...pressor delay jumper is removed NOTE The 30 second off cycle is not functional when jumpering the TEST pins Time Delay The defrost control includes a compressor timer which ensures the compressor is o...

Страница 22: ...16 3 5 Ton 22 4 Ton 22 5 Ton 5 Based on outdoor ambient temperature of 82 F and indoor entering air of 80 F db 67 F wb Table 8 Heat Pump Cooling System Performance Values Model Liquid Subcooling 2 2 T...

Страница 23: ...432 457 483 36 250 275 301 326 336 351 375 399 423 446 470 493 42 248 271 293 316 325 339 362 385 411 436 462 487 48 265 286 308 329 338 352 376 400 427 455 482 509 60 256 276 296 316 324 340 365 386...

Страница 24: ...WHT GRN 5 7 5KW HEATER ACCESSORIES FUNCTION OFF W1 ONLY BLK J2 1 J2 2 BLK C 1 2 3 4 5 J2 6 J2 5 WHT BLU RED YEL WHT B1 PUR B4 BLACK ORG L N G B3 S1 TRANSFORMER TI L G N BLK K1 1 CONTACTOR YEL W STRIPE...

Страница 25: ...will be seen Also when a pressure switch opens and caused a short cycle lockout the pressure switch open code will be seen until it closes then the short cycle lockout code will flash unless it has al...

Отзывы: