background image

www.lennoxeurope.com



+7 495 626 56 53



+34 902 533 920



+380 44 461 87 79



+44 1604 669 100



+ 32 3 633 3045



+33 1 64 76 23 23



+49 (0) 6071 3915919



+ 39 02 495 26 200



+ 31 332 471 800



+48 22 58 48 610



+351 229 066 050



+33 4 72 23 20 00

BALTIC-IOM-0412-E

Due to Lennox’s ongoing commitment to quality, the specifi cations, ratings and dimensions are 
subject to change without notice and without incurring liability.
Improper installation, adjustment, alteration, service or maintenance can cause property damage 
or personal injury.
Installation and service must be performed by a qualifi ed installer and servicing agency

SALES OFFICES :

OTHER COUNTRIES :

RUSSIA

SPAIN

UKRAINE

UNITED KINGDOM AND IRELAND

BELGIUM AND LUXEMBOURG

FRANCE

GERMANY

ITALY

NETHERLANDS

POLAND

PORTUGAL

LENNOX DISTRIBUTION

Содержание BAC 024 SNM 3M

Страница 1: ...20 85 kW Installation operating and maintenance BALTIC IOM 0412 E BALTIC Rooftop units air cooled...

Страница 2: ......

Страница 3: ...ROL MANUAL CERTIFICATES All the technical and technological information contained in this manual including any drawing and technical descriptions provided by us remain the property of Lennox and must...

Страница 4: ......

Страница 5: ...h a crane Lifting the roof curbs DELIVERY CHECKS Rating plate Storage Maintenance key Condensate drains Preliminary checks Installation requirements Connections INSTALLATION ON A ROOF MOUNTING FRAME R...

Страница 6: ...52 DHM 3M 49 5 60 BAG 057 DHM 3M 54 7 60 BAG 065 DHM 3M 61 9 60 BAG 075 DHM 3M 73 4 120 BAG 085 DHM 3M 79 8 120 BAM 024 SSM 3M 23 3 20 8 20 BAM 030 SSM 3M 28 9 26 5 20 BAM 038 SSM 3M 36 8 35 1 20 BAM...

Страница 7: ...ed in this manual including any drawing and technical descriptions provided by us remain the property of LENNOX and must not be utilised except in operation of this product reproduced issued to or mad...

Страница 8: ...y coolant gas and oil Transport Handling Access Never lift the unit without forklift protections An approach ramp must be installed if the unit s installation requirements tell that it s necessary to...

Страница 9: ...2 E Installation manual TRANSPORT HANDLING Mandatory handling devices MANDATORY HANDLING DEVICES Handling slings to guide the unit toward the roof curb Vacuum lifting beam to position the unit COMPLIA...

Страница 10: ...7 4 37 4 37 4 45 45 45 45 62 3 62 3 49 6 49 6 49 6 49 6 67 5 67 5 67 5 67 5 92 9 92 9 36 2 36 2 36 2 36 2 54 9 54 9 54 9 54 9 86 4 86 4 20 9 20 9 20 9 20 9 28 4 28 4 28 4 28 4 35 9 35 9 65 65 65 65 70...

Страница 11: ...ccording to the figure below Do not remove the unit plastic cover while lifting IMPORTANT note for unit clearances Ensure the fresh air inlet does not face prevailing wind direction If machine is incl...

Страница 12: ...nder the machine Before installation remove the forklift protection which is located under machine desk IMPORTANT note about forklift protection removal Take care not to hurt anybody when removing the...

Страница 13: ...fting lug dimensions Use lifting shackles located on each angle of the unit Maximum diameter of the ring shaft 20 mm Lifting belts length The unit must be lifted using spacing beams to avoid the belts...

Страница 14: ...Lifting the roof curbs Ducting connection details The supply and return air ducts can be secured to the 30 mm flanges at the bottom of the roofcurb Any ducting weight above 100 kg must be fixed indepe...

Страница 15: ...NG THE UNITS Exhaust roofcurb Non adjustable roofcurb Adjustable roofcurb Multidirectionnal roofcurb WARNING all multidirectionnal flowcurb and horizontal extraction flow curb must be secured to the g...

Страница 16: ...n position Keep protective plastic film in position Ensure the electrical panels are closed Keep all items and options supplied in a dry and clean place for future assembly before using the equipment...

Страница 17: ...that the unit is installed in accordance with the installation instructions and local applicable codes Check to ensure that the refrigerant lines do not rub against the cabinet or against other refri...

Страница 18: ...ing frame on the trimmer beam by first lining up the inlet and the outlet opening After levelling the frame secure the adjustable returns on the trimmer When the frame is correctly positioned it is es...

Страница 19: ...anual IMPORTANT note Prior to put the machine make sure to put a polyethylene foam on the curb upper flange side must be delivered in the curb package INSTALLATION ON A ROOF MOUNTING FRAME Positioning...

Страница 20: ...Installation manual NON ADJUSTABLE NON ASSEMBLED ROOFCURB INSTALLATION Frame parts packing Different parts are used in the assembly of this roof mounting frame There are delivered stacked on a pallet...

Страница 21: ...ed as all parts required are supplied with the frame Securing the frame To ensure proper mating with units it is mandatory that the roof mounting frame be squared to roof structure as follows With fra...

Страница 22: ...here pipes and electrical conduits extend through the roof flashing must conform to local codes of practice Beforeinstallingtheequipment makesurethatsealsarenotdamaged and check that the unit is secur...

Страница 23: ...s a thermodynamic heat recovery module included in the machine Its main interests are a variable fresh air rate from 25 to 100 a high COP in winter when pre heating the fresh air due to a favorable ev...

Страница 24: ...20 VRHS HRVS VRVS HRHS BALTIC IOM 0412 E Installation manual PLATE HEAT RECOVERY CONFIGURATIONS ERVF HRMV EBHO HRMH Return Return Return Fresh air Fresh air...

Страница 25: ...through the two top slots 6 Install the heat recovery module on the bracket by taking care to position properly the lower mounting bar Don t forget to remove the lifting covers from the module 7 Slid...

Страница 26: ...top slots 5 Install the heat recovery module by taking care to position properly the lower mounting bar Don t forget to remove the lifting covers from the module 6 Slide the T plate into the lifting l...

Страница 27: ...23 VRHS HRVS VRVS HRHS BALTIC IOM 0412 E Installation manual THERMODYNAMIC HEAT RECOVERY CONFIGURATIONS ERVF TRMO EBHO TRMO Return Return Return Fresh air Fresh air...

Страница 28: ...and can be accessible from the supply e Drive compartment Circuit specifications 2 COMMISSIONING Electrical connections All wire connections are factory made Starting up CLIMATIC configuration Power t...

Страница 29: ...orrect airflow rates Check fan exhaust or supply function of the mode Amps and also filter Refrigerant charge too high Checktherefrigerantchargeloadaccording to the refrigerant load table See also fri...

Страница 30: ...nsation 329 max HP 62 C condensation 319 min LP between 24 5 C and 1 6 C function of the condensation temperature during 5 min freezing or air flow on evaporator issue 327 max LP 26 C 317 limit LP 27...

Страница 31: ...power Wire connection tightness checks CLIMATIC configuration Powering the unit EDRIVE VENTILATION FRESH AIR HOOD FILTERS REFRIGERATION CIRCUIT HEATING OPTIONS Hot water coils Electric heater Electri...

Страница 32: ...nical and technological information contained in this manual including any drawing and technical descriptions provided by us remain the property of LENNOX and must not be utilised except in operation...

Страница 33: ...frigerating circuits can cause an explosion and spray coolant gas and oil Transport Handling Access Never lift the unit without forklift protections An approach ramp must be installed if the unit s in...

Страница 34: ...ent checked Yes No Yes No Fan speed rpm Averaged measured amps A Shaft mechanical mower Refer to airflow balancing W Operating point checked Yes No Yes No Read airflow m3 h 6 EXTERNAL SENSOR CHECKS Ch...

Страница 35: ...atures Phase 1 Phase 2 Phase 3 Temperatures Pressures Suction Disch LP HP Comp1 A A A C C Bar Bar Comp2 A A A C C Bar Bar Comp3 A A A C C Bar Bar Comp4 A A A C C Bar Bar HP cut out Bar LP cut out Bar...

Страница 36: ...ess Site operator Cooling load Refrigerant type Refrigerant quantity kg Unit manufacturer Year of installation General information Date Engineer Quantity kg Reason for addition Refrigerant additions D...

Страница 37: ...OGBOOK EUROPEAN REGULATION N 842 2006 Date Engineer Test Result Follow up Action Required Leak tests part 2 Date Engineer Related to test dated Action taken Follow up actions Date Engineer Test result...

Страница 38: ...65 1 8 0 8 0 2 8 0 8 0 E 75 1 10 5 10 5 2 10 5 10 5 85 1 10 5 10 5 2 10 5 10 5 BALTIC IOM 0412 E Service manual REFRIGERANT TRANSACTIONS LOGBOOK EUROPEAN REGULATION N 842 2006 Refrigerant load accord...

Страница 39: ...are CE marked according to Pressure Equipement Directive Periodical visit according european pressure equipment directive According to Pressure Equipments Directive periodical controls on site are ex...

Страница 40: ...ion Ensure that the power supply between the building and the unit meets local authority standards and that the cable specification satisfies the start up and operating conditions displayed on the nam...

Страница 41: ...ce manual eDrive VENTILATION eDrive assembly instructions specification The flexible elastomeric tire is removable without removing the plates The material is natural rubber Temperature range from 42...

Страница 42: ...controling the airflow within the operating range of each kit Airflow rate calculation inputs are rpm and power absorbed output read on the inverter variable bus The airflow rate calculation formula...

Страница 43: ...355 L 4 0 85 K3 826 1409 6100 9300 8 4 ADH 355 L 5 5 0 87 K4 930 1499 7100 11100 12 2 ADH 355 L 7 5 0 88 K5 1070 1578 8700 13100 16 3 AT 15 11 G2L 5 5 0 87 K1 760 1310 10000 13000 12 2 AT 15 11 G2L 7...

Страница 44: ...fan type motor size If ever the Inverter loose fan control No Fan or Wrong fan speed Compressor or Heating stay on one may check the Inverter configuration as below 0 0 will be displayed in this case...

Страница 45: ...al on the top of the hood cover Wind direction The prevailing wind has to be taken into account while choosing the machine position on the building roof It s highly recommended to avoid putting the fr...

Страница 46: ...Airflow in page 3343 25Pa by default No filter in page 3344 50Pa by default Dirty Filter in page 3345 250Pa by default The actual pressure drop measured accross the coil can be read on the CLIMATIC Di...

Страница 47: ...ic expansion valve 2 electronic valves types are fitted on BALTIC E2V E3V EEV adjustments EEV allows the control of superheat in biflow operation see CLIMATIC 60 sections E2V welding instructions Elec...

Страница 48: ...for possible leaks Freeze protection Check the hydraulic system contains glycol for protection against freezing Glycol is the only effective protection against freezing The antifreeze must protect the...

Страница 49: ...uce the pressure drops the airflow is ducted around the shielded resistances The resistances are made smooth stainless steel tubes with a capacity of 6W cm2 It is protected as standard against overhea...

Страница 50: ...C section A metallic filter is installed between air filter electrical resistance to protect against heat radiations WARNING electric pre heater is connected heater to mainS power risk of electrical S...

Страница 51: ...e threaded connection for gas burner 3 4 Check that the gas supply line can provide the burners with the pressure and the gas flow rate necessary to provide the heating nominal output Starting up the...

Страница 52: ...sequence Extraction fan Smoke extraction fan ON 30 to 45 seconds pre ventilation Fire up spark electrode 4s Opening of the gas valve high heat Flame propagation towards the ionisation probe If ionisa...

Страница 53: ...sened the screw by one turn Check and adjust if necessary the valve outlet pressure to 8 4 mbar G20 12 3 mbar for groningue G25 31 4 mbar for propane G31 the burner must run in high heat mode for this...

Страница 54: ...f necessary the outlet pressure to 3 5 mbar G20 or 5 mbar for groningue G25 14 mbar for propane G31 Valve electrical control Pressure adjustments table for each type of gas mbar Category Supply pressu...

Страница 55: ...ning close the shut off valve located before the rooftop the flame disappears the fan is still running and attempting to restart the burner restart cycle 30 to 45 seconds if the ignition probe is not...

Страница 56: ...Normal operation Gas valve open Gas control valve closes BURNER STOPS Gas control valve closes BURNER STOPS Fault on gas control block 6 minutes delay Fault on CLIMATIC Supply thermostat limit Auto R...

Страница 57: ...ition control block and on ef connection board Check the fan supply voltage Replace fan Replace ef connection board if necessary Extraction fan is on After 30 to 45 seconds pre ventilation the fire up...

Страница 58: ...0 mbar 0 1 full scale a multimeter with ohmmeter and micro amps scale an adjustable spanner tube spanner set 8 9 10 and 13 flat screwdrivers diameter 3 and 4 fillips n 1 vacuum cleaner paint brush Dis...

Страница 59: ...Transformer 400 230V Minimum gas pressure switch and inlet pressure plug Gas valve and solenoid Gas ignition control block and BG50 connection board Ignition electrode Ionisation probe Gas inshot bur...

Страница 60: ...burner Purge the pipe work near the connection on the ignition control valve for a few seconds check that the unit s treatment fan blower is running set the control to on this will priorities the gas...

Страница 61: ...r after having loosened the screw by one turn Check and adjust if necessary the valve outlet pressure to 8 4 mbar G20 or 12 3 mbar for G25 the burner must run in high heat mode for this check place th...

Страница 62: ...re to 1 5 mbar minimum G20 or 2 25 mbar for G25 after the adjustment of the low heat re verify the high heat re position the stoppers and close the pressure ports Valve electrical control Pressure adj...

Страница 63: ...as burner Gas burner troubleshouting Idem non modulating gas burner If the valve s flow is not correct check the operation of the actuator and of the mechanical assembly Replace the actuator if necess...

Страница 64: ...IL Heat recovery water coil is delivered with a loose 3 ways valve inside carton to be assembled on site by installer The freeze protection is made via fresh damper safeties nevertheless for a full fr...

Страница 65: ...expansion valve Attempt to free the valve adjusting element by freezing the valve and then heating the thermostatic element Replace the valve if necessary Expansion valve not adjusted properly Adjust...

Страница 66: ...valve Check the pressure drop on the filter drier in the suction line Four way reversing valve possibly blocked abnormal noise from the valve low LP and increasing HP Check operation of the valve by...

Страница 67: ...ck seals around the ventilation section Check the door seal Check for the presence of silicone seals in the corners of the door and at the bottom of the refrigeration section bulkhead Water ingress in...

Страница 68: ...12 E Service manual SPARE PART LIST Refrigeration components R410A Designation Familly Code Compressor Comp Comp Comp INDOOR coil ID Cbox size 24 30 Coil ID Cbox size 38 42 Coil ID Dbox Coil ID Ebox C...

Страница 69: ...rvice manual SPARE PART LIST Casing Designation Familly Code Economiser Fresh air hood grille C box Sheet metal Fresh air hood grille D box Fresh air hood grille E box Insulation Rockwool Insulation i...

Страница 70: ...h 28 20 al sage 28 4950050M Cast Bush 30 25 al sage 25 4950053R Cast Bush 30 25 al sage 28 4950054T Cast Bush 30 25 al sage 30 4950238N M6x30 5680408T M6x30 5480956H Tube ep 5 mm noir 4680360K Double...

Страница 71: ...been applied by the owner for these applications which has been recommended by a competent body not linked to the owner and after carrying out a study of the site 5 Nevertheless the LENNOX coating is...

Страница 72: ...nded to follow such a plan to keep a rooftop unit in good working order Regular maintenance of your rooftop will extend its operating life and reduce operating faults Note Times are given for informat...

Страница 73: ...rs Check absorbed Amps Check absorbed Amps on all three phases compare with the nominal value given in the electrical wiring diagram Check Smoke detector Start the unit Trigger the smoke detector by m...

Страница 74: ...ut down the axial fans and wait for the HP switch to shut down the compressor 29 bar 1 0 auto reset 22 bar 0 7 Reconnect fans Switch off the centrifugal supply fan and wait for the LP switch to cut ou...

Страница 75: ...s a protection down to aprox 15 C check the circuit pressure Check defrost cycle with 4 way valve inversion Switch the unit to heat pump mode Change the set point to obtain the standard defrost mode a...

Страница 76: ...72 BALTIC IOM 0412 E Service manual...

Страница 77: ...TANT WARNING ONE DC60 FOR ONE AND ONLY ONE ROOFTOP TEMPERATURE MEASUREMENT RELATIVE HUMIDITY MEASUREMENT CONFIGURATION INITIALIZATION PRESENTATION USE q On Off unit Setting time Information available...

Страница 78: ...s equipped with a temperature sensor The temperature sensor allows the acquisition of room temperature to control WARNING Separate as much as possible probes displays logical input cables from power c...

Страница 79: ...shield The cable length with power should not exceed 30m The cable length without power 24V external must not exceed 150m For a better electromagnetic protection Lennox recommends the use of LiYCY Pca...

Страница 80: ...o use the measure of the DC60 1 BM B12 or 2 BM B1 to use the remote probe Note for rooftop with a medium CLIMATIC 60 connect the remote sensor between points B12 and GND terminal block J18 for rooftop...

Страница 81: ...lue Turn the knob to adjust the desired value Press again on the knob to confirm your choice The symbol is no longer displayed on the right side of the value The rotation of the knob is for select a n...

Страница 82: ...he connection between the CLIMATIC 60 and the DC60 is correct Online to power up the screen displays only the symbol This phase allows the CLIMATIC 60 to set up the DC60 with options of rooftop After...

Страница 83: ...riefly press the button To set the time press the button a few seconds The hour value flashes Turn the knob to adjust the desired value Press the knob to select your choice Then the minute value flash...

Страница 84: ...By rotating the knob you can view or modify the following values This item can know the number of rooftop connected to the DC60 This item allows you to view and or modify the control temperature requi...

Страница 85: ...is to 0 By this item it s possible to reset the alarm activated To do this set the value of the item to the value 0 This item indicates the measure temperature of the air outside This item indicates t...

Страница 86: ...e 000 flashes Turn the knob to change the value to select the number 066 Then validate the code by pressing the knob If the code is wrong access the setup menu is not possible and the DC60 returns to...

Страница 87: ...jack on the back of the DM60 screen attach the front panel on the back using provided countersunk screws snap frame The display is connected to CLIMATIC DM60 on the screw terminals of the card DT50 T...

Страница 88: ...but the connectors A and SC are not Displays connected to these ports are not powered If J14 and J15 are set differently the DT50 dispatcher DOESN T WORK and therefore connected displays don t work Te...

Страница 89: ...onnection with star is not recommended for optimum performance it is advisable to connect a maximum of two cables per unit The connection must be wired as follows For a length of 0 to 300 m AWG22 0 34...

Страница 90: ...anged is displayed If after 5 seconds the display is not correct access a second time the setup mode by pressing the arrow enter and down arrow keys for at least 5 seconds up to the next screen press...

Страница 91: ...Day I mode Day II mode If the unit is in alarm this symbol is displayed Small numerical value volatile set point temperature View and or modify the offset or set point of the desired temperature contr...

Страница 92: ...pressing the alarm button directs you to the alarm list display pressing the prg button directs you to the rooftop setup menus display pressing the esc button takes you to the selected rooftop choice...

Страница 93: ...de set point visualization Alarm list History used to store the last 99 alarms occurred on the unit each alarm is stored on the date and time the fault occurred an active alarm is signified by the bel...

Страница 94: ...utton it puts you on the next digit password or directs you to the selected function screen Pressing the down arrow button decreases the password digit value or selects the next function Setting Tempe...

Страница 95: ...ing the enter button validates the selection then directs you to the rooftop setup menus display Pressing the down arrow button reverses the state View edit alarm and safety reset Pressing the alarm b...

Страница 96: ...lected value View edit hour and minutes of each zone beginning View edit the zone operating mode The schedule is different each weekday You must set a schedule for monday tuesday and sunday The visual...

Страница 97: ...ficates CERTIFICATES Ref BALTIC_Certificates IOM 0412 E TABLE OF CONTENTS Certificates are given for information only To get the uptodate certificates please contact your local LENNOX reprensentative...

Страница 98: ...94 BALTIC IOM 0412 E Certificates CE CONFORMITY DECLARATION...

Страница 99: ...95 BALTIC IOM 0412 E Certificates CE CONFORMITY DECLARATION...

Страница 100: ...erational Manual Certification Diploma N 09 04 422 Rooftops LGL France S A Z I Les Meurieres BP 71 69780 Mions Cedex France LENNOX EUROPE LENNOX OM 13 2011 OM 13 2011 LGL France S A Erick MELQUIOND Ma...

Страница 101: ...97 BALTIC IOM 0412 E Certificates CERTIGAZ...

Страница 102: ...he specifications ratings and dimensions are subject to change without notice and without incurring liability Improper installation adjustment alteration service or maintenance can cause property dama...

Отзывы: