506257-01
Issue 1330
Page 26 of 29
Start-Up and Performance Checklist
Job Name _____________________________ Job No. ____________ Date ___________
Job Location ___________________________ City _______________
State ___________
Installer _______________________________
City _______________
State ___________
Unit Model No. _________________________
Serial No._____________________________
Service Technician _______________________
Nameplate Voltage _____________________
Rated Load Ampacity _________ Compressor Amperage ________ Outdoor Fan __________
Maximum Fuse or Circuit Breaker ________________________
Electical Connections Tight? Indoor Filter Clean? Supply Voltage (Unit Off) __________
Indoor Blower RPM ___________________ S.P. Drop Over Indoor (Dry) ____________________
Outdoor Coil Entering Air Temperature ________ Voltage with Compressor Operating __________
Outdoor Fan Checked?
Cooling
Liquid Line Pressure _______ Suction Line Pressure _______ Refrigerant Charge Checked?
Heating
Liquid Line Pressure _______ Suction Line Pressure _______ Refrigerant Charge Checked?
Refrigerant Lines: Leak Checked? Properly Insulated?
Service Valves: Fully Opened? Caps Tight?
Thermostat: Calibrated? Properly Set? Level?
Sequence of Operation
Heating Correct? Cooling Correct?