Lennox Hearth Products EBVCLNE Скачать руководство пользователя страница 5

5

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

Top Radiant
Panel

Top Bustle

Bottom

Bustle

Control
Compartment
Access Panel

Unit Parts Identification

Figure 4

Step 3.

 

Install the Vent System &

Exterior Termination -

In the United States, vent installation must
conform with local building codes. In the ab-
sence of local codes, vents must be installed in
accordance with the current edition of the
National Fuel Gas Code (ANSI-Z223.1).

In Canada, vent installation must conform
with local building codes. In the absence of
local codes, vents must be installed in ac-
cordance with the current edition of the Na-
tional Standard of Canada CAN/CGA-B149.1
or B149.2 Installation Code.

This gas fireplace must be vertically vented
using listed 6 in. type-B, double-walled vent
pipe and a listed vent termination.

If the appliance is to be elevated above floor
level, a solid continuous platform must be
constructed. Headers may be in direct contact
with the appliance top spacers but must not be
supported by them or notched to fit around
them.  All construction above the appliance
must be self supporting, 

DO NOT

 use the

appliance for structural support.

Side Nailing Flanges

The fireplace should be secured to the framing at
the side(s) and/or rear of the unit using the
factory-provided nailing flanges. Install the nail-
ing flanges - 8 (EBVST), 4 (EBVPF, EBVCL,
EBVCR) - as shown in 

Figure 5 

using the existing

screws. Position the fireplace within the fram-
ing. When required, the flanges may be bent 90
degrees by hand or with the assistance of a
hammer. Use  wood screws to secure the nailing
flanges to the framing. 

See Table 2 on page 4

 for

clearances of framing members to cabinet parts
in the nailing flange area. The nailing flange itself
is exempt from these clearances.

Step 2.  ROUTING GAS LINE

Step 1.

(page 5) Construct the appliance

framing.  Position the appliance within the
framing and secure with nailing brackets.

Step 2.

(page 5) Route gas supply line to

appliance location.

Step 3.

(page 5) Install the vent system

and exterior termination.

Step 4.

(page 10) Field Wiring

a. 

Millivolt Appliances –

 

The operating con-

trol switch is  factory installed.

b.

 Electronic Appliances – Connect 120 Vac

electrical power to the appliance receptacle.

Step 5.

(page 11) Make connection to gas

supply.

Step 6.

(page 12) Outside Air Kit Installation

Step 7.

(page 13) Install the log set, ver-

miculite and glowing embers.

Step 8.

(page 13) Checkout appliance op-

eration.

Step 9.

(page 13) Install glass enclosure

panels.

Step 10.

(page 14) Burner Adjustment.

Step 11.

(page 14) Spillage Test and Safety

Limit Switch Operation.

Step 12.

(page 15) Install the hoods.

3

- Open the control compartment access

panel, by actuating the spring-loaded mag-
netic catches securing the panel, gently de-
pressing the outer top corners of the panel
until the catches "pop" the panel free and
allowing it to swing out and down to open.

  

See

Figure 20 on page 12.

4

 - Open the latches (located on the left and

right sides of the unit front opening, under the
firebox floor) securing the glass enclosure panel.
Remove the panel by tilting it outward at the
bottom and lifting it up. Set the door aside
protecting it from inadvertent damage. 

See

Figure 24

 

on page 13.

Step 1. FRAMING

Frame these appliances as illustrated in 

Fig-

ures 8 (EBVST), 9 (EBVPF), 10 (EBVCL) or
11 (EBVCR) on pages 6 and 7

. All framing

details must allow for a minimum clearance
to combustible framing members as shown
in

Table 2 on page 4

.

Figure 5

DETAILED INSTALLATION STEPS

All appliances are factory-equipped with a flex-
ible gas line connector and

 ¹⁄₂

 inch shutoff valve.

(See step 5 on page 11)

.

Route a 

¹⁄₂

" (13 mm) gas line as shown in

Figures 8 (EBVST), 9 (EBVPF), 10 (EBVCL) or
11 (EBVCR)  on pages 6 and 7

.  Gas lines must

be routed, constructed and made of materials
that are in strict accordance with local codes
and regulations.

Turn tabs down and secure to the floor with
8d nails or other appropriate fasteners on all sides
of the unit which do not have viewing glass panels.

EBVST SHOWN

(EBVPF - NO NAILING FLANGES ON END WITH GLASS PANEL)

EBVCL SHOWN

(FOR EBVCR VIEW,  INTERCHANGE SIDES)

Remove these two screws and use them
when installing the nailing flanges.

Nailing

Flanges

The appliance is shipped with all gas controls
and components installed and pre-wired.

- Remove the shipping carton.

2

  - Remove the top radiant panel; 

see Figure 4.

Floor Nailing Tabs

Secure the fireplace to the floor as shown in

Figure 5.

See the page numbers references in the follow-
ing steps for detailed procedures.

Содержание EBVCLNE

Страница 1: ...rvice dos incendies L installationetservicedoit treex cut parunqualifi installeur agencedeserviceoulefournisseurdegaz B VENT MULTI OPEN ELITE SERIES B VENTED GAS FIREPLACES P N 850 025M REV B 01 2007...

Страница 2: ...c stone and one bag of vermiculate is located in the bottom compartment INTRODUCTION These vented gas fireplaces are designed for residential applications They must be installed with approved type B 6...

Страница 3: ...re not prohibited by local codes This appliance is only for use with the type of gas indicated on the rating plate This ap pliance is not convertible for use with other gases unless a certified kit is...

Страница 4: ...Height from Roof to Lowest Discharge Opening In addition when the unit is installed in the middle of a room the side walls surrounding the unit must not extend beyond the front or rear edge of the un...

Страница 5: ...tronic Appliances Connect 120 Vac electrical power to the appliance receptacle Step 5 page 11 Make connection to gas supply Step 6 page 12 OutsideAirKitInstallation Step 7 page 13 Install the log set...

Страница 6: ...nits is contemplated it should be dis cussed with an architect and the local Build ing Department Do not place insulation materials within 1 in of the gas vent system FIREPLACE FRAMING SPECIFICATIONS...

Страница 7: ...hes millimeters 6 159 9 248 Optional Gas Line Location Center of gas line is 3 in 76 mm up from floor Gas Line Center of gas line is 3 in 76 mm up from floor Minimum Framing Stud size is 2 x 4 41 1054...

Страница 8: ...top 1 2 13 DETAIL OF FINISH WALL BRACKET 13 2 ELECTRICAL INLETS B A B 8 203 DIA FLUE COLLAR 6 175 4 116 4 116 OUTSIDE AIR SHUTTER EBVPF Peninsula 12 305 20 510 TOP VIEW 40 1019 FRAMING SPACERS Top an...

Страница 9: ...2 20 510 OUTSIDE AIR SHUTTER 4 116 B A A 6 152 DIA FLUE OUTLET B 8 203 DIA FLUE COLLAR 13 24 610 6 175 12 305 2 70 3 76 13 41 1041 37 940 24 610 12 305 FRONT VIEW LEFT SIDE VIEW TOP VIEW 4 102 40 101...

Страница 10: ...out Remove the modesty panel care fully so that none of the wires become loose or disconnected 5 Remove the outlet receptacle by remov ing the two securing screws See Figure 17 The left and right desi...

Страница 11: ...in a potential safety hazard The appliance must be electrically grounded in accordance with local codes or in the absence of local codes the National Electrical Code ANSI NFPA 70 latest edition In Ca...

Страница 12: ...duct vertically DO NOT terminate the duct closer than 3 below the chimney top Outside combustion air ducting may be run upwards or vertically through framing and ceiling joists with the hood installe...

Страница 13: ...he pilot The pilot flame should engulf the flame rod as shown in Figure 23 Replace logs after pilot inspection To light the burner turn ON the modesty panel mounted ON OFF switch and rotate the gas va...

Страница 14: ...the operation of this safety limit switch First allow the appliance to cool then reset the safety switch by pushing the red reset button on the back of the switch To access the blocked flue safety li...

Страница 15: ...th of the mantel See Figure 27 Mantels constructed of non combustible materials may be installed at any height above the appliance opening however do not allow anything to hang below the hood Figure 2...

Страница 16: ...L TE JUSQU L OP RATION DE L APPAREIL CONVERTI EST CH QUE SUIVANT LES CRIT RES TABLIS DANS LES INSTRUCTIONS DE PROPRI TAIRE PROVISIONN ES AVEC L QUIPEMENT WARNING THIS CONVERSION KIT SHALL BE INSTALLED...

Страница 17: ...and 10 0 inches water column 2 49 kPa for propane gas See Figure 33 and replace the pilot orifice as follows Remove the ignitor assembly retainer clip andcarefullyremovetheignitorassembly Exercise ex...

Страница 18: ...placeitwiththeoneprovidedinthe kit See the following table for orifice sizes for natural and propane models Figure 34 illustrates the orifice B InstalltheburnersasshowninFigure29 The primary air openi...

Страница 19: ...19 NOTE DIAGRAMS ILLUSTRATIONS NOT TO SCALE NOTES...

Страница 20: ...0 025M REV B 01 2007 Lennox Hearth Products reserves the right to make changes at any time without notice in design materials specifications prices and also to discontinue colors styles and products C...

Отзывы: