![LEGRAND 3 372 02 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/legrand/3-372-02/3-372-02_specifications_1871811033.webp)
31
DISTRIBUTION CABINETS
XL
3
S 160
To make the wiring of the protective
conductors, it’s also possible to use one (or
more) copper bars Cat. No 0 373 89 that you
have to cut. (Original length → 990 mm).
As the holes of the bar are threaded, the
mounting lugs are placed between the
copper bar and the screw heads (M5 screws,
not supplied)
For the installation of an IP 2X distribution
terminal block, you need to use a flat bar
12 x 2 mm Cat. No 0 048 19. This bar is also
fixed on the lugs supplied with the cabinet.
You must cut and drill it, as follows:
Maximum lenght:
24 modules
→ maximum length 510 mm
36 modules
→ maximum length 726 mm
Fixing centres: 400 mm in 24 modules
cabinets and 616 mm in 36 modules
cabinets.
Drilling: Ø 5 mm. Fixing screw: M5 + nuts
(not supplied).
400 mm
55
55
510 mm
Exemple with 24 modules cabinet
Minimum lenght:
24 modules
→ minimum length 410 mm
36 modules
→ minimum length 630 mm
Fixing centres: 400 mm in 24 modules
cabinets and 616 mm in 36 modules
cabinets
Drilling: Ø 5 mm. Fixing screw: M5 + nuts
(not supplied).
400 mm
410 mm
Example with 24 modules cabinet
Borniers IP 2X
2 additional 47 mm (max.) termi-
nal blocks (IP 2X or bare) Cat. Nos
0 048 20, 0 048 30, 0 048 40 or
0 048 50 can be fixed on each side
of the 12 x 2 mm flat bar, when cut to the
maximum length.
WWW.LEGRAND.COM
Содержание 3 372 02
Страница 38: ...36 Notes...