![LEGRAND 3 372 02 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/legrand/3-372-02/3-372-02_specifications_1871811029.webp)
27
DISTRIBUTION CABINETS
XL
3
S 160
■
Fitting the handle
1- Fit and introduce the handle in the hole.
2- Insert the cross bolt at the back of the
handle, against the door.
3- Once the door release of the handle
installed, turn it with the key in lock
position in order to check the proper
functioning.
Metal doors Cat. Nos 3 372 57,
3 372 58, 3 372 67, 3 372 68 and
glass doors Cat. Nos 3 372 77,
3 372 78, 3 372 87, 3 372 88 are equipped
with 2 handles.
The door axis are designed to be
fit and removed without tools.
The door installation is made
easier.
■
Equipotential link
You have to make an equipotential link
if control and signalling units or device
with voltage U>50 V are fitted on the door.
The doors are equipped with studs
for connecting the equipotential link
conductor Cat. No 3 397 53.
1- Remove the dedicated plastic cover on
the cabinet (2 covers available). Then,
cut it to enable the cable to pass:
2-
Put the plastic cover back in its
location, fit the cable on the stud of the
cabinet (with a M6 nut). Then, pass it
through the cover:
3- Remove the protection cover of the
earth stud and fit the cable and with
the help of a M6 nut.
WWW.LEGRAND.COM
Содержание 3 372 02
Страница 38: ...36 Notes...