Optional trim plate installation
Used for retrofit installation, if gaps need to be filled in.
Jamb
Jamb
Jamb
Jamb
Jamb
Jamb
Cabinet
L
IMPORTANT: Do not apply power to the unit until you have fully read the instructions and have made the required
adjustments!
The 8310-2420 cabinet should be mounted in a clean, dry location out of direct contact with the elements. The cabinet
base dimensions can be seen on the separate cabinet base template (on page 17).
DPS Switch
L
NOTE: The gap distance should not exceed 0.75”.
1a Determine mounting location on the door frame.
1b Mark and drill two holes for mounting the switch.
1c Mount the switch to the frame with the screws.
1d Align the magnet on the door with the switch.
1e Mark and drill two holes for the mounting magnet.
1f Mount the magnet with the screws.
Transformer
The transformer should only be installed OUTSIDE of the Power Supply Cabinet per all National Electric Code (NEC) /
NFPA 70 requirements along with local code requirements, and it should be kept in close proximity to the Power Supply
Cabinet. For verification of code compliance, we recommend reaching out to the AHJ (Authority Having Jurisdiction), which
may be your local Fire Marshall. Pending approval from the AHJ, the transformer may be mounted to the side of the Power
Supply Cabinet (requires drilling) or mounted in a separate utility box to house it (typically installed by an electrician). As
previously stated, the installation will need to be compliant with all local and NEC requirements.
Black
Black
Red
Red
Primary (120V AC)
Secondary (24V AC)
Transformer Schematic
318''
[78.48mm]
7
8''
[22.35mm]
218''
[55.50mm]
134''
[44.70mm]
258''
[66.68mm]
214''
[55.88mm]
0''
[1.27mm]
Ă
1
8''
[3.81mm]
138''
[34.80mm]
214''
[57.15mm]
178''
[47.63mm]
134''
[43.18mm]
Ă
1
8''
[4.76mm]
1''
[25.40mm]
334''
[93.73mm]
TYP
TYP
OPEN STYLE FILAMENT & L.V. RECTIFIER USE
TRANSFORMERS
Содержание 8310-2420
Страница 17: ...7 Cabinet base template 9 8 6...
Страница 18: ......
Страница 19: ......
Страница 20: ......