3: EMG 8500 Installation
EMG™ Edge Management Gateway User Guide
41
To configure the EMG unit using a dumb terminal or a computer with terminal emulation,
connect the terminal or PC to the front panel EMG console port. See
Connecting Terminals (on page 47)
5. Connect the power cord to power on the unit. See
.
6. Wait approximately one minute for the boot process to complete.
The first time the EMG boots, it attempts to get an IP address from DHCP. To configure the
network settings, see
Rack Mount Installation
shows two possible rack mount configurations.
Figure 3-4 EMG 8500 Rack Mount Dimensions
1. Attach the brackets on the sides of the EMG unit using a screwdriver and the screws provided
with the mounting kit.
2. Mount the unit securely in a 19-inch rack.
Warning:
Do not block the air vents on the sides of the EMG module. If you mount
the EMG in an enclosed rack, we recommend that the rack have a
ventilation fan to provide adequate airflow through the EMG unit.
Содержание EMG 7500
Страница 1: ...Part Number PMD 00008 Revision C April 2020 EMG Edge Management Gateway User Guide EMG 8500 EMG 7500 ...
Страница 82: ...7 Networking EMG Edge Management Gateway User Guide 82 Figure 7 2 Network Network Settings 2 of 2 ...
Страница 100: ...7 Networking EMG Edge Management Gateway User Guide 100 Figure 7 5 Network Wireless Settings ...
Страница 353: ...15 Maintenance EMG Edge Management Gateway User Guide 353 Figure 15 12 About EMG ...
Страница 474: ...EMG Edge Management Gateway User Guide 474 Figure E 3 EU Declaration of Conformity ...
Страница 475: ...EMG Edge Management Gateway User Guide 475 Figure E 4 EU Declaration of Conformity continued ...