9J577-0822
2-7
Tire Installation
WARNING
NOTE
All Tire/Wheel Assemblies are mounted with the Valve
Stem facing outward from Hub and Spindle.
1. Remove the eight 9/16-18 Wheel Bolts from the Hub.
Install the tire and wheel assembly onto the hub. The
W360 Pulvi-Mulcher uses 12.5L x 16 - 14 ply tires and
should be inflated to 50 PSI.
2. Re-Install the Wheel Bolts and tighten to 50
foot-pounds using the sequence in
Then
tighten to full torque of 90-100 ft-lbs. It is good
maintenance practice to lubricate the wheel bolts prior
to inserting.
Figure 2-5: Stud Tightening Sequence
NOTE
Torque will drop after the first 10 hours of operation.
Check the nuts for proper torque after this interval and
re-tighten them.
Figure 2-6: Tire Installation
Use a torque wrench to assure proper torque.
Insufficient torque can cause stud breakage and
damage the wheel pilots. Over torque can
overstress the studs and strip the threads.
1
6
4
7
2
5
3
8
Hub
Tire
Wheel Bolt
Содержание Brillion WCC
Страница 4: ......
Страница 8: ...iv 9J577 0822 TABLE OF CONTENTS...
Страница 14: ...1 6 9J577 0822 TABLE OF CONTENTS Figure 1 4 Front View 1 3 3 3 3 3 7 7 7 7 2 8 4 4 4 4 9 11 10...
Страница 15: ...9J577 0822 1 7 TABLE OF CONTENTS Figure 1 5 Rear View 3 4 1 6 7 8 9 4 8 3 3 7 6 3 3 4 4 7 7 6 7 6...
Страница 16: ...1 8 9J577 0822 TABLE OF CONTENTS Table provided for general use NOTES...
Страница 51: ...9J577 0822 2 35 TABLE OF CONTENTS Table provided for general use NOTES...
Страница 59: ...9J577 0822 2 43 TABLE OF CONTENTS Table provided for general use NOTES...