Impact of Boot-up on Data Storage
The concentrator boot-up/reset impacts the data storage. The nature of the impact varies based on the
type of the boot-up. There are three kinds of boot-up:
•
Cold Boot - DTT is cleaned up. ODE is cleaned up. The concentrator will not remember any
endpoints.
•
Warm boot - DTT is intact. ODE is cleaned up. The concentrator remembers the endpoints it
heard. However, there are no database objects corresponding to them.
•
Hot Boot - DTT is intact; and ODE is intact.
Capacity
The following table describes the data storage capacity in concentrators.
Cycling Power
To immediately reboot the concentrator, perform the following steps:
1.
Disconnect the AC cable from its connection on the concentrator.
2.
Wait five seconds.
3.
Re-connect the AC power cable to the concentrator.
Table D-1. Concentrator Capacity
Type
Concentrator
Meter Endpoints (Cellnet 1-way meter module)
5000
ASAP objects
300
Load Profile (LP) Objects
3000
NOTE:
Only 1000 TOMMs can be set on Load Profile.
DTT entries
40000
Calendar objects
20
Time of Use (TOU) objects
20
Ramlog size
1024 x 80 bytes
Disconnect the cable from the concentrator end, not the AC power source end.
Do not disconnect the battery cable. If you cannot reach the AC cable on the
concentrator end, then unplug at the source. You must wait 3 days for the
battery to completely drain before you reconnect this cable.