Page 2 of 69
Issue: 1.8
Revision History
© Gyr
E470 Tokenless Smart Prepayment Meter
Revision History
Issue Date
Comments
1.0
21.05.07
Initial release for Approval bodies
1.1
19.06.07
Amendments to meet approvals specification
1.2
26.06.07
2nd round of amendments to meet approvals specification
1.3
20.07.07
Further addition to the data sheet to cover LVD requirements
1.4
03.08.07
Further additions at section 1.4 and to the data sheet to satisfy TUV
requirements
1.5
04.09.07
Supply cabling specification added to section 1.7
1.6
24.10.07
Signal strength comments added at section 6.2
1.7
19.11.08
Revised manual to new branding guidelines and layout
1.8
14.09.09
Addition of features to support 5236J-Y functionality
Copyright notice
The material in this document is the property of Gyr. Our products are under continual
improvement and we reserve the right to make changes without prior notice.
Gyr
1 Lysander Drive,
Northfields Industrial Estate,
Market Deeping,
Peterborough
PE6 8FB
www.landisgyr.com