17. Slide the
handrails into the
upright fittings.
Open hardware
bag "STEP 5" and
use the smaller
allen key to
commence the (2)
screws on each
rail. NOTE: There
is a difference
between right and
left rails ("L" / "R"
decals).
18. Use the
remaining bolts in
hardware bag
"STEP 5" to fasten
the bottom of the
rail. Once you
tighten these, finish
tightening the
smaller screws at
the top of the rail.
Once rails are
tight, finish
tightening the
upright screws
from
assembly
"Step 12" and the
handrail screws
from the previous
step.
19. Open
hardware bag
"STEP 7". Use the
screws that have a
sharp
point at the
end to fasten the
plastic bed
endcaps. Each
endcap used (4)
screws.
20. Feed the
upright harness
(found in
membrane box)
down the leg.
Slide it all the way
down until you can
grab it at the base
of the machine
through the access
hole. TIP: Once
you grab the
harness at the
base, make sure to
clip in the harness
at the top of the
upright to prevent it
from falling down
inadvertently.
Tip: If you
have
trouble with
alignment,
use a long
screw-
driver as a
lever at the
base of the
rail to help
get the first
bolt in.
13mm
PAGE 19
Содержание ELLIPTIMILL E8
Страница 30: ...PAGE 30 ELLIPTIMILL BED FRAME...
Страница 31: ...PAGE 31 ELLIPTIMILL CRANK ASSEMBLY...
Страница 32: ...PAGE 32 ELLIPTIMILL UPRIGHT...
Страница 33: ...PAGE 33 ElliptiMill Parts Assembly...
Страница 63: ...PAGE 63 ELLIPTIMILL MAIN HARNESS...
Страница 64: ...PAGE 64 LVS 2ND GENERATION FOR ELLIPTIMILL...