Section 5: Maintenance & Lubrication
1/14/19
RC4610 (540 RPM) and RCM4610 (1000 RPM): Rotary Cutters: 334-144M:
56
Figure 5-14
Figure 5-15
23556
8-10 pumps
Zerk Located through slot in tube
CV Driveline without overrunning clutch
8-10 pumps
CV Driveline with overrunning clutch
39280
23556
4-5 pumps
2-3 pumps
2-3 pumps
4-6 pumps
CV Driveline without overrunning clutch
4-5 pumps
2-3 pumps
4-6 pumps
2-3 pumps
CV Driveline with overrunning clutch
IMPORTANT:
Attach safety chain (#1) to tractor frame.
Attach safety chain (#2) to cutter frame.
2
1
39280
CV Main Driveline Profile Tubes
With External Grease Point
CV = Constant Velocity
Type of Lubrication: Multi-purpose Grease
Quantity = 8-10 pumps
IMPORTANT:
To extend the life of the constant
velocity joint, extensive lubrication must be
performed every 8 hours of operation.
CV Main Driveline Joints
CV = Constant Velocity
Type of Lubrication: Multi-purpose Grease
For instructions on how to access grease zerks shown
in Figure 5-14 & Figure 5-15, refer to
•
The constant velocity joint should be greased in a
straight position forcing grease through the passages
and into the cavity. After lubrication, grease should
be visible around the ball joints.
•
Grease fittings located on the u-joints and driveline
shields should be lubricated every 8 Hrs of operation.
IMPORTANT:
To extend the life of the constant
velocity joint, extensive lubrication must be
performed every 8 hours of operation.
8
Hours
8
Hours