Appendix C - Accessory Installation
2018-06-12
3P500, 3P500V, & 3P600
313-517M
45
Walkboard Installation (3P500V)
These instructions apply to an installation of walkboard
kit part number 119-301A82.
Installation of the 119-301A82 kit usually requires two
workers. If also installing the SMV (page 46), install the
SMV first.
Refer to Figure 30
1.
Select one:
119-300H82 5’ VINEYARD WALKBOARD
and two sets:
802-079C HHCS 3/8-16X1 1/4 GR5
804-013C WASHER LOCK SPRING 3/8 PLT
803-014C NUT HEX 3/8-16 PLT
2.
Align the top holes
of the top tabs on the
walkboard with the top rear holes
in the drill side
frames. Insert bolts
from the outside. Loosely
secure with lock washers
and nuts
.
3.
Select six sets:
802-079C HHCS 3/8-16X1 1/4 GR5
804-013C WASHER LOCK SPRING 3/8 PLT
803-014C NUT HEX 3/8-16 PLT
Insert bolts
at remaining tab and frame holes.
Add lock washers
and nuts
. Tighten all to
Grade 5 torque.
4.
Clean and dry the outside end faces of the
walkboard, and the rear face near the outside ends.
5.
Select two:
838-102C DECAL WARNING FALLING HAZARD
Remove the release paper backing on a decal.
Carefully align it on an end plate. Apply it to the end
plate and smooth out any air bubbles. Repeat for
other end of walkboard.
6.
Select two:
838-266C DECAL REFLECTOR RED 1 1/2X9
Remove the release paper backing on the decal.
Carefully align it on outside end of the rear face of
the walkboard. Apply it to the face and smooth out
any air bubbles. Repeat for other end of walkboard.
Figure 30
3P500V Walkboard
32715
14
27
30
34
2
1
47
46
14
27
34
30
1
2
27
34
30
27
34
30
27
34
30
46
47
Содержание 3P500
Страница 4: ...Table of Contents Index ...
Страница 50: ...Table of Contents ...
Страница 52: ...Corporate Office P O Box 5060 Salina Kansas 67402 5060 USA Table of Contents ...