PRE-INSTALLATION CHECKLIST
BEFORE GETTING STARTED
Each unit is tested under operating conditions and is thoroughly inspected before
shipment. At the time of shipment, the carrier accepts responsibility for the unit. Upon receiving the
unit, carefully inspect the carton for visible damage. If damage exists, have the carrier note the
damage on the freight bill and file a claim with carrier. Responsibility for damage to the dispenser
lies with the carrier.
POST MIX ACCESSORIES:
BIB SYSTEM:
DOUBLE CHECK:
CONSIDER THE LOCATION OF THE FOLLOWING BEFORE
INSTALLATION:
Water supply lines
Drain
Grounded electrical outlet
Heating and air conditioning ducts
Direct sunlight (avoid) or overhead lighting
Is the countertop level?
Is there enough space to install the dispenser? Be sure to include space for a top-mounted
ice machine, if necessary.
Can the countertop support the weight of the dispenser? Be sure to include the weight of an
ice machine (if necessary) plus the weight of the ice.
Does the top-mounted ice machine have a minimum clearance on all sides?
BIB Rack
BIB Regulator Set
BIB Connectors - ensure you have the correct connectors for syrup lineup.
BIB Syrup Boxes
CO
2
Regulator Set
Beverage Tubing
CO
2
Supply
Water Booster
Oetiker Clamps/Fittings
Water Regulator
5
P.N. 28-0580/02
Содержание FLAVOR SELECT 22
Страница 11: ...11 P N 28 0580 02 1 3 FS22 INSTALLATION OVERVIEW 1...
Страница 12: ...12 P N 28 0580 02 1 4 FS22 INSTALLATION OVERVIEW 2...
Страница 39: ...39 P N 28 0580 02 NOTES...