27
5
Operating Control and Displays
5.6.2
Program Sequence
Set duration of pre-purge period
NOTICE
Both values are identical – Confirm with
.
The values are different – Cancel with
.
Duration pre-purge period
Duration post purge period
valve leakage test
Pilot burner gas operation
Pilot burner oil operation
Parameter number UI
Parameter modifications are transferred
BT
= Parameter number BT300
Parameter modifications are discarded
Содержание BT300 BurnerTronic
Страница 2: ......
Страница 39: ...38 6 Leakage Test for Main Gas Valves Fig 6 2 Leakage test process diagram...
Страница 46: ...45 7 Technical Data...
Страница 47: ...46 7 Technical Data...