background image

BOX 422 • TOWER, MN 55790 • USA • Tel (218) 753-2330 • www.lamppakuuma.com

3

INTRODUCTION

Your Vapor-Fire Model 100 by Lamppa Manufactur-

ing and Distributing Co., Inc., is a highly-sophisticat-

ed, electronically-controlled, solid fuel furnace utiliz-

ing the latest space-age technology. If installed and 

operated properly it should give you years of satis-

fying heat. Please read all of the instructions before 

installing and operating your new Vapor-Fire Model 

100.

We ask that you contact your sales person and ar-

range for a professional installation.

Installation must be done by a qualified installer.

LIMITED WARRANTY

Your  basic  Vapor-Fire  Model  100  is  warranted  for 

twenty-five (25) years from the date of purchase by 

Lamppa Manufacturing and Distributing Co., Inc., if it 

is installed and maintained according to the instruc-

tions provided by the manufacturer. This warranty is 

voided if the Vapor-Fire 100 is used to burn materials 

for which the unit is not certified by the EPA, and void 

if not operated according to the owner’s manual.

Under this warranty the manufacturer will repair de-

fects  in  workmanship  and  replace  defective  parts 

free of charge to the customer. Any repairs that might 

require welding, burning, patching, etc., that is nor-

mally done in the manufacturer’s plant, the customer 

shall ship the furnace, freight prepaid, to the plant at 

no cost to Lamppa Manufacturing and Distributing 

Co., Inc.

This  warranty  does  not  apply  to  any  heat  shields, 

brick holders, or parts, such as seals, latches, hing-

es, other moving parts that wear out under normal 

usage. 

Under  this  warranty,  all  electrical  components  are 

covered  for  a  period  of  90  days  from  date  of  pur-

chase  if  installed  according  to  the  manufacturer’s 

instructions. The customer shall provide to the man-

ufacturer, proof of purchase. Any repairs or replace-

ment  of  components  shall  have  a  prior  agreement 

between the customer and the manufacturer, before 

any such action is undertaken.

Dimensions ................................51.5” H x 27” W x 52.25” D

Flue Size .............................................................. 6” Diameter

Heat Outlet Size ...................................................... 24” x 24”

Fire Door Opening ........................................... 12” W x 12” H

Control Type ........................................................... Electronic

Ash Drawer Size ....................................19” L x 10” W x 3” D

Combustion Chamber .....................23” L x 15.5” W x 20” H

Maximum Wood Length ...................................................22”

Combustion Chamber Lining ......... Brick Liner and Cast Iron

Fan Limit Control .............................Honeywell L 4064B2210

Fan Low Limit .....................................White Rogers 3F01-33

24 Volt Honeywell Thermostat ...............................T87K1007

Fan Relay ....................................... Honeywell R8239A 1052

Electronic Draft Control ............... Vapor Fire Model 100/200

Draft Requirement ........................................ .03” - .06” W.C.

Filter .............................................................14” x 24” x 1” (2)

Cold Air Return ............................................... 22” W x 26” H

Power Req’d .....15 amps, 120 volt, 60 Hz No. 14 AWG wire

Clearance to Combustible

Side .....................................................................................6”

Front ..................................................................................48”

From the Flue Pipe ............................................................18”
Weight .................................................................695 pounds

Fuel Type ............................................................... Wood only

Chimney Requirement ....................................... 6” Class “A”

SPECIFICATIONS

Figure 1

27”

34.25”

24”

24”

30.75”

10”

18”

4.5”

2”

51.5”

6”

15.5”

Your Vapor-Fire Model 100 furnace is warranted for 

(10) years against defects in materials and workman-

ship from the date of purchase, except for electrical 

components and the blower, which carry a (1) year 

manufacture warranty.  Warranty does not apply to 

fire-bricks, seals, latches, hinges, or other moving 

parts subject to normal wear and tear.

The manufacturer’s warranty extends only to the orig-

inal purchaser, applies to normal residential use, and 

is not transferable. 

The furnace must be installed, maintained, and op-

erated according to the Manufacturer’s Operator’s 

Instructions.  The warranty is voided if the Vapor-Fire 

100 is used to burn materials not certified by the EPA 

and not operated according to the owner’s instruc-

tions.   

Upon obtaining authorization, returned products are 

to be shipped prepaid to the manufacturer.  Transpor-

tation fees to ship the product back to the purchaser 

will be paid by the manufacturer.

This warranty applies to products purchased after 

September 1st, 2021.

Содержание KUUMA 100

Страница 1: ...UTION Lamppa Manufacturing Inc READ ALL INSTRUCTIONS AND RULES FOR SAFE OPERATION CAREFULLY BEFORE STARTING THE INSTALLATION FOLLOW ALL STATE AND LOCAL CODES AND ORDINANCES BOX 422 TOWER MN 55790 USA...

Страница 2: ...Chamber Rear View 12 Mounting Controls 13 Wiring Schematic 14 Draft Measurement and Stove Pipe Connections 15 Normal Automatic Operations 16 Dos and Don ts of Operation 17 Basic Firing Instructions 18...

Страница 3: ...f of purchase Any repairs or replace ment of components shall have a prior agreement between the customer and the manufacturer before any such action is undertaken Dimensions 51 5 H x 27 W x 52 25 D F...

Страница 4: ...t control field con trol 6 RC BT as described and illustrated on page 7 and 9 also see figures 9 10 11 7 WE SUGGEST THAT A LICENSED ELEC TRICIAN BE HIRED TO DO ALL YOUR ELECTRICAL CONNECTIONS See wiri...

Страница 5: ...Association 60 Batterymarch Street Boston Massachusetts 02110 For equipment of this type National Fire Protection Agency NFPA Standard No 90B specifies the minimum standard clearances to combustible s...

Страница 6: ...RIC POWER FAILURE BOX 422 TOWER MN 55790 USA Tel 218 753 2330 www lamppakuuma com 6 HOT C O L D R E T U R N H O T H O T C O L D CHECK FLAP STOP STOP TWO SPEED SWITCHES 500 1500 CFM ON DEMAND CHECK FLA...

Страница 7: ...allation and Figure 6 of Masonry Chimney note roof clearance in ac cordance with NFPA 211 COMMON CHIMNEY PROBLEMS In order to have a proper operating Solid Fuel Heat System the chimney must be capable...

Страница 8: ...use an obstruction to draft as well as a place for debris to collect 7 Elbow Restrictions The flue pipe is connected to the chimney with too many elbows reducing the draft the chimney can provide Use...

Страница 9: ...approximate 45 degree adj elbows for angled connections NO HORIZONTAL PIPING INSTALLATION Barometric Draft Control field 6 RC BT provided with your model 100 Vapor Fire Furnace A draft reg ulator is...

Страница 10: ...ary to disassemble unit down to the main frame in order to move into older homes without damage to the Model 100 shell or electronics If this must be done please refer to the following assembly steps...

Страница 11: ...e side panel holes and secure with metal screws the holes are on each end of the channel Do the same with the top channel and secure tightly Now slide the blower assembly housing towards the back of t...

Страница 12: ...eel removable secondary air tubes are located on the right and left sides of the door frame inside the fire chamber They actually pro vide the fourth level of combustion air to complete the burn proce...

Страница 13: ...wiring to fans in fan enclosure as shown in Figure 23 K Run incoming conduit to transformer junction box and connect to a separate circuit breaker panel Use a 15 amp AWG copper wire to the fur nace Gr...

Страница 14: ...IDE COVER JUNCTION BOX 4 X 4 X 2 4 X 4 X 2 BOX INDICATES WIRE NUT DOTTED WIRING BY OTHERS BLUE TO RED FOR LOW SPEED RED TO BLACK FOR HIGH SPEED 2 X 4 X 2 BLACK YELLOW BLUE RED WHITE WT OUTSIDE COVER W...

Страница 15: ...and adjustable elbows 2 Angle your stove pipes upward towards the chimney smoke exit hole 3 Install barometric damper provided Set to 03 to 06 WC 4 Avoid using 90 degree pipe bends unless it s one 90...

Страница 16: ...ucts and registers The display screen is furnished on the electric control to provide the following A The letters O and P will blink on and off and the beeper beeps intermittently when there is an ope...

Страница 17: ...Unit Rake hot coals to the FRONT as shown DO NOT BLOCK PRIMARY AIR OPENINGS Keep coals approximately 1 from front air inlets HOT COALS ASHES HOT COALS ASH PAN RAKE A I R P R I M A R Y Figure 30 Perio...

Страница 18: ...en finished STARTING A COLD FURNACE NO HOT COALS A Open fire door B Scrape entire fire chamber ashes through open grate into ash pan using side paddle on ash scraper provided C Preheat fire chamber wi...

Страница 19: ...g the combustion process It consists of a number of elements which condense and bake layer upon layer in the chimney flue Highly combustible in its solid and semi liquid state creosote is present in t...

Страница 20: ...Yellow Birch 3000 26 000 000 185 Red Oak 3250 27 000 000 195 White Oak 3750 27 700 000 200 Hard Maple 3000 29 000 000 200 Hickory 3500 30 500 000 215 USEFUL FACTS No 2 Fuel Oil 140 000 BTU gallon Nat...

Страница 21: ...R OVER THE COLD AIR RETURNS IN YOUR HOME C The cold air return of your forced air upflow fur nace is inadequate It may be necessary to in crease its capacity D If you don t seem to get enough air circ...

Страница 22: ...control B Soot and creosote buildup in heat exchanger or chimney Clean if necessary C Chimney too low Increase chimney height D Obstruction in chimney Check for obstruction such as loose mortar bird n...

Страница 23: ...t we call the pilot burn and will continue like this until the fire chamber cools down and then the control again takes over and will adjust the shutter opening based on the fire chamber tem perature...

Страница 24: ...ws or a short chimney do not in stall the heat exchanger baffles you could get a draft reversal Smoke backing up or the smell of smoke would indicate a poor draft If questionable have your draft check...

Страница 25: ...prohibit the use of fire starters made from paper cardboard sawdust wax and similar substances for the purpose of starting a fire in an affected wood heater Be absolutely sure to install both UL appr...

Страница 26: ...by Intertek a certified lab each burn level was less than 15 pounds of emissions per million Btu s with an overall average of 0 093 This not only satisfies the EPA requirement from 2015 2020 of 93 po...

Страница 27: ...d operate the furnace according to the owner s manual 3 Use seasoned firewood approximately one year dried under cover 15 30 3 Install both carbon monoxide CO and smoke detector alarms 3 Always rememb...

Отзывы: