ASSEMBLY IF UNIT IS NOT ASSEMBLED

Set  main  housing  unit  in  place,  refer  to  figure  12, 

with metal screws provided, attach the right and left 

panels to the bottom lip of the channel as shown. 

Then place the top panel in place and secure it to 

the top of the side panels with the metal screws. Se-

cure the front of the side panels with four screws to 

brackets that are welded to both sides of the main 

housing. Where the side panels overlap in the back 

fasten the overlap with the metal screws. Install the 

slip joint onto the back of the hood as shown. When 

the hood is all assembled slide the felt, with the metal 

slip joints into the square hole in the back.

ASSEMBLY OF THE BLOWER & FILTER 
HOUSING BOX

Refer to figures 14 and 16, place fan assembly on the 

fan housing base so that the holes in the brackets 

align with the bolts that are already in the base. Place 

the  washers  and  nuts  in  place,  but  don’t  tighten 

down the nuts yet. Next, attach the side panels with 

the metal screws that were provided. Then slide the 

bottom channel in place so that the holes align with 

the side panel holes and secure with metal screws 

(the holes are on each end of the channel). Do the 

same with the top channel and secure tightly.

Now slide the blower assembly housing towards the 

back of the main housing so that the base slides un-

derneath the main housing, about 2-3 inches, mak-

ing  sure  that  the  side  panels  are  against  the  main 

housing hood and secure it with the metal screws. 

Make sure that the fan outlet lip slides into the felt 

lined square hole in the hood and forms a tight seal 

around the lip. Now tighten the nuts. Set the large 

cover in place so that the front lip slides into the slip 

joint in the back of the hood.

Place the air filters into the channels. Place the filter 

cover in place.

The  completed  assembly,  without  the  fans,  should 

look like the drawing in Figure 15.

BOX 422 • TOWER, MN 55790 • USA • Tel (218) 753-2330 • www.lamppakuuma.com

11

Figure 15

Figure 14

Figure 16

BLOWER & FILTER BOX

BACK

PRE-ASSEMBLED

TOP

FAN HOUSING 
BASE

UPPER 

CHANNEL

RIGHT 

SIDE

LEFT 

SIDE

BOTTOM 

CHANNEL

24V RELAY

BLOWER FAN 

OPENING

SMOKE COLLAR

FRONT HOOD

BONNET FLANGE

BOTTOM FAN 

HOUSING

UPPER REAR 
PANEL

FELT JOINT

ELECTRONIC 

DRAFT 

CONTROL

DRAFT 

DAMPER 

ASSEMBLY

CABLE CLIP

HIGH LIMIT 
CONTROL

LOW LIMIT 
CONTROL

MOTOR BOX 
ASSEMBLY

FAN JUNCTION BOX

BLOWER FAN BASE

Содержание KUUMA 100

Страница 1: ...UTION Lamppa Manufacturing Inc READ ALL INSTRUCTIONS AND RULES FOR SAFE OPERATION CAREFULLY BEFORE STARTING THE INSTALLATION FOLLOW ALL STATE AND LOCAL CODES AND ORDINANCES BOX 422 TOWER MN 55790 USA...

Страница 2: ...Chamber Rear View 12 Mounting Controls 13 Wiring Schematic 14 Draft Measurement and Stove Pipe Connections 15 Normal Automatic Operations 16 Dos and Don ts of Operation 17 Basic Firing Instructions 18...

Страница 3: ...f of purchase Any repairs or replace ment of components shall have a prior agreement between the customer and the manufacturer before any such action is undertaken Dimensions 51 5 H x 27 W x 52 25 D F...

Страница 4: ...t control field con trol 6 RC BT as described and illustrated on page 7 and 9 also see figures 9 10 11 7 WE SUGGEST THAT A LICENSED ELEC TRICIAN BE HIRED TO DO ALL YOUR ELECTRICAL CONNECTIONS See wiri...

Страница 5: ...Association 60 Batterymarch Street Boston Massachusetts 02110 For equipment of this type National Fire Protection Agency NFPA Standard No 90B specifies the minimum standard clearances to combustible s...

Страница 6: ...RIC POWER FAILURE BOX 422 TOWER MN 55790 USA Tel 218 753 2330 www lamppakuuma com 6 HOT C O L D R E T U R N H O T H O T C O L D CHECK FLAP STOP STOP TWO SPEED SWITCHES 500 1500 CFM ON DEMAND CHECK FLA...

Страница 7: ...allation and Figure 6 of Masonry Chimney note roof clearance in ac cordance with NFPA 211 COMMON CHIMNEY PROBLEMS In order to have a proper operating Solid Fuel Heat System the chimney must be capable...

Страница 8: ...use an obstruction to draft as well as a place for debris to collect 7 Elbow Restrictions The flue pipe is connected to the chimney with too many elbows reducing the draft the chimney can provide Use...

Страница 9: ...approximate 45 degree adj elbows for angled connections NO HORIZONTAL PIPING INSTALLATION Barometric Draft Control field 6 RC BT provided with your model 100 Vapor Fire Furnace A draft reg ulator is...

Страница 10: ...ary to disassemble unit down to the main frame in order to move into older homes without damage to the Model 100 shell or electronics If this must be done please refer to the following assembly steps...

Страница 11: ...e side panel holes and secure with metal screws the holes are on each end of the channel Do the same with the top channel and secure tightly Now slide the blower assembly housing towards the back of t...

Страница 12: ...eel removable secondary air tubes are located on the right and left sides of the door frame inside the fire chamber They actually pro vide the fourth level of combustion air to complete the burn proce...

Страница 13: ...wiring to fans in fan enclosure as shown in Figure 23 K Run incoming conduit to transformer junction box and connect to a separate circuit breaker panel Use a 15 amp AWG copper wire to the fur nace Gr...

Страница 14: ...IDE COVER JUNCTION BOX 4 X 4 X 2 4 X 4 X 2 BOX INDICATES WIRE NUT DOTTED WIRING BY OTHERS BLUE TO RED FOR LOW SPEED RED TO BLACK FOR HIGH SPEED 2 X 4 X 2 BLACK YELLOW BLUE RED WHITE WT OUTSIDE COVER W...

Страница 15: ...and adjustable elbows 2 Angle your stove pipes upward towards the chimney smoke exit hole 3 Install barometric damper provided Set to 03 to 06 WC 4 Avoid using 90 degree pipe bends unless it s one 90...

Страница 16: ...ucts and registers The display screen is furnished on the electric control to provide the following A The letters O and P will blink on and off and the beeper beeps intermittently when there is an ope...

Страница 17: ...Unit Rake hot coals to the FRONT as shown DO NOT BLOCK PRIMARY AIR OPENINGS Keep coals approximately 1 from front air inlets HOT COALS ASHES HOT COALS ASH PAN RAKE A I R P R I M A R Y Figure 30 Perio...

Страница 18: ...en finished STARTING A COLD FURNACE NO HOT COALS A Open fire door B Scrape entire fire chamber ashes through open grate into ash pan using side paddle on ash scraper provided C Preheat fire chamber wi...

Страница 19: ...g the combustion process It consists of a number of elements which condense and bake layer upon layer in the chimney flue Highly combustible in its solid and semi liquid state creosote is present in t...

Страница 20: ...Yellow Birch 3000 26 000 000 185 Red Oak 3250 27 000 000 195 White Oak 3750 27 700 000 200 Hard Maple 3000 29 000 000 200 Hickory 3500 30 500 000 215 USEFUL FACTS No 2 Fuel Oil 140 000 BTU gallon Nat...

Страница 21: ...R OVER THE COLD AIR RETURNS IN YOUR HOME C The cold air return of your forced air upflow fur nace is inadequate It may be necessary to in crease its capacity D If you don t seem to get enough air circ...

Страница 22: ...control B Soot and creosote buildup in heat exchanger or chimney Clean if necessary C Chimney too low Increase chimney height D Obstruction in chimney Check for obstruction such as loose mortar bird n...

Страница 23: ...t we call the pilot burn and will continue like this until the fire chamber cools down and then the control again takes over and will adjust the shutter opening based on the fire chamber tem perature...

Страница 24: ...ws or a short chimney do not in stall the heat exchanger baffles you could get a draft reversal Smoke backing up or the smell of smoke would indicate a poor draft If questionable have your draft check...

Страница 25: ...prohibit the use of fire starters made from paper cardboard sawdust wax and similar substances for the purpose of starting a fire in an affected wood heater Be absolutely sure to install both UL appr...

Страница 26: ...by Intertek a certified lab each burn level was less than 15 pounds of emissions per million Btu s with an overall average of 0 093 This not only satisfies the EPA requirement from 2015 2020 of 93 po...

Страница 27: ...d operate the furnace according to the owner s manual 3 Use seasoned firewood approximately one year dried under cover 15 30 3 Install both carbon monoxide CO and smoke detector alarms 3 Always rememb...