BOX 422 • TOWER, MN 55790 • USA • Tel (218) 753-2330 • www.lamppakuuma.com

13

Figure 22

Install  warm  air  plenum  and  cut  hole  for  high  limit 

control. Refer to Figure 22.

Refer to wiring diagram Figure 23 and 25.

A.  Mount control transformer.

B.  Mount high limit control.

C.  Mount low limit control.

D.  Mount electronic control.

E.  Connect thermocouple to terminals (white lead to 

– red lead +).

F.  Connect  conduit  from  draft  control  box  to  fan 

junction box with conduit nut and connect wires.

G.  Run conduit from transformer to low limit switch 

and fan junction box, Figure 26.

H.  Add wires as shown in Figure 23 and connect.

I.  Mount thermostat in house and connect to relay 

control (24 VAC). Refer to Figure 23.

J.  Connect wiring to fans in fan enclosure as shown 

in Figure 23.

K.  Run  incoming  conduit  to  transformer  junction 

box  and  connect  to  a  separate  circuit  breaker 

panel. Use a 15 amp AWG copper wire to the fur-

nace. Ground the furnace to the electrical system 

ground.

L.  We recommend that a licensed electrician do the 

electrical wiring.

M.  With  wiring  completed,  check  the  system  by 

turning on the power. The light on the electronic 

control should energize. The draft control will re-

main closed until the thermocouple is heated to 

approximately 100-120 degrees F.

Figure 24

Figure 25

AIR SUPPLY 
PLENUM

7/8” DIA. HOLE

HIGH LIMIT 

CONTROL

LEVEL

THERMOSTAT WIRE

FRONT COVER

RIGHT SIDE

LEFT

SIDE

CONDUIT 
TUBING

DRAFT 
DAMPER 
ASSEMBLY

ELECTRONIC 

DRAFT 

CONTROL

TRANSFORMER

SMOKE PIPE

HIGH LIMIT 

CONTROL

LOW LIMIT CONTROL

DAMPER ADAPTOR BOX

FAN JUNCTION BOX

FAN HOUSING BASE

THERMOSTAT BASE

THERMOSTAT

6.25”

17.75”

7.5”

Содержание KUUMA 100

Страница 1: ...UTION Lamppa Manufacturing Inc READ ALL INSTRUCTIONS AND RULES FOR SAFE OPERATION CAREFULLY BEFORE STARTING THE INSTALLATION FOLLOW ALL STATE AND LOCAL CODES AND ORDINANCES BOX 422 TOWER MN 55790 USA...

Страница 2: ...Chamber Rear View 12 Mounting Controls 13 Wiring Schematic 14 Draft Measurement and Stove Pipe Connections 15 Normal Automatic Operations 16 Dos and Don ts of Operation 17 Basic Firing Instructions 18...

Страница 3: ...f of purchase Any repairs or replace ment of components shall have a prior agreement between the customer and the manufacturer before any such action is undertaken Dimensions 51 5 H x 27 W x 52 25 D F...

Страница 4: ...t control field con trol 6 RC BT as described and illustrated on page 7 and 9 also see figures 9 10 11 7 WE SUGGEST THAT A LICENSED ELEC TRICIAN BE HIRED TO DO ALL YOUR ELECTRICAL CONNECTIONS See wiri...

Страница 5: ...Association 60 Batterymarch Street Boston Massachusetts 02110 For equipment of this type National Fire Protection Agency NFPA Standard No 90B specifies the minimum standard clearances to combustible s...

Страница 6: ...RIC POWER FAILURE BOX 422 TOWER MN 55790 USA Tel 218 753 2330 www lamppakuuma com 6 HOT C O L D R E T U R N H O T H O T C O L D CHECK FLAP STOP STOP TWO SPEED SWITCHES 500 1500 CFM ON DEMAND CHECK FLA...

Страница 7: ...allation and Figure 6 of Masonry Chimney note roof clearance in ac cordance with NFPA 211 COMMON CHIMNEY PROBLEMS In order to have a proper operating Solid Fuel Heat System the chimney must be capable...

Страница 8: ...use an obstruction to draft as well as a place for debris to collect 7 Elbow Restrictions The flue pipe is connected to the chimney with too many elbows reducing the draft the chimney can provide Use...

Страница 9: ...approximate 45 degree adj elbows for angled connections NO HORIZONTAL PIPING INSTALLATION Barometric Draft Control field 6 RC BT provided with your model 100 Vapor Fire Furnace A draft reg ulator is...

Страница 10: ...ary to disassemble unit down to the main frame in order to move into older homes without damage to the Model 100 shell or electronics If this must be done please refer to the following assembly steps...

Страница 11: ...e side panel holes and secure with metal screws the holes are on each end of the channel Do the same with the top channel and secure tightly Now slide the blower assembly housing towards the back of t...

Страница 12: ...eel removable secondary air tubes are located on the right and left sides of the door frame inside the fire chamber They actually pro vide the fourth level of combustion air to complete the burn proce...

Страница 13: ...wiring to fans in fan enclosure as shown in Figure 23 K Run incoming conduit to transformer junction box and connect to a separate circuit breaker panel Use a 15 amp AWG copper wire to the fur nace Gr...

Страница 14: ...IDE COVER JUNCTION BOX 4 X 4 X 2 4 X 4 X 2 BOX INDICATES WIRE NUT DOTTED WIRING BY OTHERS BLUE TO RED FOR LOW SPEED RED TO BLACK FOR HIGH SPEED 2 X 4 X 2 BLACK YELLOW BLUE RED WHITE WT OUTSIDE COVER W...

Страница 15: ...and adjustable elbows 2 Angle your stove pipes upward towards the chimney smoke exit hole 3 Install barometric damper provided Set to 03 to 06 WC 4 Avoid using 90 degree pipe bends unless it s one 90...

Страница 16: ...ucts and registers The display screen is furnished on the electric control to provide the following A The letters O and P will blink on and off and the beeper beeps intermittently when there is an ope...

Страница 17: ...Unit Rake hot coals to the FRONT as shown DO NOT BLOCK PRIMARY AIR OPENINGS Keep coals approximately 1 from front air inlets HOT COALS ASHES HOT COALS ASH PAN RAKE A I R P R I M A R Y Figure 30 Perio...

Страница 18: ...en finished STARTING A COLD FURNACE NO HOT COALS A Open fire door B Scrape entire fire chamber ashes through open grate into ash pan using side paddle on ash scraper provided C Preheat fire chamber wi...

Страница 19: ...g the combustion process It consists of a number of elements which condense and bake layer upon layer in the chimney flue Highly combustible in its solid and semi liquid state creosote is present in t...

Страница 20: ...Yellow Birch 3000 26 000 000 185 Red Oak 3250 27 000 000 195 White Oak 3750 27 700 000 200 Hard Maple 3000 29 000 000 200 Hickory 3500 30 500 000 215 USEFUL FACTS No 2 Fuel Oil 140 000 BTU gallon Nat...

Страница 21: ...R OVER THE COLD AIR RETURNS IN YOUR HOME C The cold air return of your forced air upflow fur nace is inadequate It may be necessary to in crease its capacity D If you don t seem to get enough air circ...

Страница 22: ...control B Soot and creosote buildup in heat exchanger or chimney Clean if necessary C Chimney too low Increase chimney height D Obstruction in chimney Check for obstruction such as loose mortar bird n...

Страница 23: ...t we call the pilot burn and will continue like this until the fire chamber cools down and then the control again takes over and will adjust the shutter opening based on the fire chamber tem perature...

Страница 24: ...ws or a short chimney do not in stall the heat exchanger baffles you could get a draft reversal Smoke backing up or the smell of smoke would indicate a poor draft If questionable have your draft check...

Страница 25: ...prohibit the use of fire starters made from paper cardboard sawdust wax and similar substances for the purpose of starting a fire in an affected wood heater Be absolutely sure to install both UL appr...

Страница 26: ...by Intertek a certified lab each burn level was less than 15 pounds of emissions per million Btu s with an overall average of 0 093 This not only satisfies the EPA requirement from 2015 2020 of 93 po...

Страница 27: ...d operate the furnace according to the owner s manual 3 Use seasoned firewood approximately one year dried under cover 15 30 3 Install both carbon monoxide CO and smoke detector alarms 3 Always rememb...

Отзывы: